BUILDING OVERVIEW |
Are Feeders Being Installed? : |
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
Building Overview Work Items |
QUANTITY |
DESCRIPTION |
SERVICE SWITCHES |
|
A. Up to 100 AMPS |
0 |
|
B. 101 Up to 200 AMPS |
0 |
|
C. 201 Up to 600 AMPS |
0 |
|
D. 601 Up to 1200 AMPS |
0 |
|
E. Over 1200 AMPS |
0 |
|
SER. ENT. & FDR COND (EACH SET) |
|
A. Up to #2 CONDUCTOR |
0 |
|
B. Over #2 to 1/0 |
0 |
|
C. Over 1/0 to 250 MCM |
0 |
|
D. Over 250 MCM |
0 |
|
PANELS |
|
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
C. 3 Phase Up to 225 AMPS |
0 |
|
D. 3 Phase Over 225 AMPS |
0 |
|
ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
B. Each Additional 10 Floors Or Less |
0 |
|
BOILER CONTROLS |
0 |
|
OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
|
001 |
( 3) |
APPLICATION FOR CERTIFICATE OF ELECTRICAL INSPECTION NOT ON FILE FOR 100 A DISC SW CIRCUIT BREAKER FOR ALL APT |
OPEN |
07/26/2008 |
07/26/2008 |
|
|
002 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY 200A SER/SW |
OPEN |
07/26/2008 |
07/26/2008 |
|
|
003 |
( 17) |
DEFECTIVE SWITCHES ARE IN USE BSMT CIRCUIT BREAKER THAT FEED APT |
OPEN |
07/26/2008 |
07/26/2008 |
|
|
004 |
(999) |
OTHER 100A DISC/SW NEUTRAL NOT PROVIDED 300.20 |
OPEN |
07/26/2008 |
07/26/2008 |
|
|
005 |
( 29) |
OUTLET BOXES ARE NOT COVERED BSMT ELECT EQUIPTMENT |
OPEN |
07/26/2008 |
07/26/2008 |
|
|
006 |
( 16) |
DEFECTIVE LIGHTING FIXTURES ARE IN USE LIGHT IN REAR OF BUILDING |
OPEN |
07/26/2008 |
07/26/2008 |
|
|
007 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED ,, ,, ,, ,, ,, ,, ,, |
OPEN |
07/26/2008 |
07/26/2008 |
|