Electrical Application Details for App #: B299034
Premises: 283 ALBANY AVENUE BROOKLYN BIN: 3036946     Block: 1382   Lot: 4
   
Application Completed and Certified

Filed: 285 ALBANY AV Census Tract:   339 Health Area:  4900
285 ALBANY AVENUE Admin Area:   B - BROOKLYN Inspection Area:   G
BROOKLYN, NY 11213 Community Board:   308
Special Place Name:   ST JOHNS PLACE
DOB Cross Street(s):   ST JOHNS PLACE,    LINCOLN PLACE
Status:   C - JOB IS SIGNED OFF 08/14/2012
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  12/18/2007 4:15 PM
Application Entered:   12/18/2007 Job Start Date:   12/19/2007
Last Change:   08/14/2012 Job End Date:   12/31/2007
Appointment Status:   
Last Inspection By:   ROBINSON HEATH       On     07/30/2012      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011697 Licensee Name: MICHAEL MURPHY
Firm: 002280 Firm Name: ASSOCIATED ELEC CONT OF N
Firm Phone: 718-882-9520  Firm Address: 27 EAST 233RD STREET NY INC. BRONX NY 10470 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $63.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: PCS METRO
Owner Business Name: METRO PCS
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  1  100 AMP SERVICE SWITCH
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  1 SET # 2
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                     
Total Units : 2 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 1 #4-Wire 0 #10-Wire 0
Existing Meters 25 + New Meters 1 - Removed Meters 0 = Total Meters 26

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 12/18/2007 Notice:  
Power Issued: 12/18/2007 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  NEW 100 AMP METER AND SWITCH FOR METRO PCS

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B299034
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/17/2008 07/21/2008 DEX P (10) (0) Y
INSPECTION COMMENTS: N
 
(2) 07/28/2009 08/03/2009 JMZ P (15) (0) Y
INSPECTION COMMENTS: N
 
(3) 09/08/2009 09/11/2009 FMO P (5) (0) Y
INSPECTION COMMENTS: NEED APPT WITH CONTRACTOR TO VERIFY JOB
 
(4) 07/30/2012 08/06/2012 HRB C E (50) (0) Y
INSPECTION COMMENTS: N