| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
1 |
|
| B. 101 Up to 200 AMPS |
4 |
|
| C. 201 Up to 600 AMPS |
1 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
1 |
|
| B. Over #2 to 1/0 |
4 |
|
| C. Over 1/0 to 250 MCM |
3 |
|
| D. Over 250 MCM |
1 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
5 |
|
| D. 3 Phase Over 225 AMPS |
1 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BSMT SERV SW AREA NEUTRAL NOT BONDED TO ENCLOSER |
RSLV |
06/23/2009 |
08/26/2009 |
01/05/2010 |
| |
| 002 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED BSMT SERV SW AREA 110.2 MDP EQUIPT USED AS SERV SW |
RSLV |
06/23/2009 |
08/26/2009 |
01/05/2010 |
| |
| 003 |
(999) |
OTHER A ROOF 10 TOM AC UNITS DISCONNECT 440-14 |
RSLV |
06/23/2009 |
08/26/2009 |
01/05/2010 |
| |
| 004 |
(999) |
OTHER B BSMT SERV SW AREA 230.71 |
RSLV |
06/23/2009 |
01/05/2010 |
03/19/2010 |
| |
| 005 |
( 6) |
FEEDER DIAGRAM DID NOT ACCOMPANY APPLICATION FOR INSPECTION SERVICE NEEDS 1 LINE DIAGRAM |
RSLV |
08/26/2009 |
08/26/2009 |
01/05/2010 |
| |
| 006 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED ROOF A/C WHITE WIRE USED AS UNGROUNDED CONDUCTOR |
RSLV |
08/26/2009 |
08/26/2009 |
01/05/2010 |
| |
| 007 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED ROOF A/C FLEX GROUND #12 NOT SUFFICIENT |
RSLV |
08/26/2009 |
08/26/2009 |
01/05/2010 |
| |
| 008 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED ROOF A/C FLEX GOES THROUGH ROOF |
RSLV |
08/26/2009 |
08/26/2009 |
01/05/2010 |
| |
| 009 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY GROUND SERVICE TO BUILDING STEEL |
RSLV |
08/26/2009 |
08/26/2009 |
01/05/2010 |
| |
| 010 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED NEED SPECS FOR COMBO PANEL SERVICE SWITCH |
RSLV |
08/26/2009 |
01/05/2010 |
03/19/2010 |
| |
| 011 |
( 56) |
ELECTRICAL MATERIAL USED IS NOT SUITABLE FOR THE PURPOSE INTENDED NEED SPECS FOR SERVICE SWITCH |
RSLV |
08/26/2009 |
01/05/2010 |
03/19/2010 |
| |
| 012 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED ELEVATOR LIGHT DISCONNECT SWITCH GROUNDED TO K SCREW |
RSLV |
08/26/2009 |
08/26/2009 |
01/05/2010 |