| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
2 |
600 AMP |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
4 |
2/3 |
| C. Over 1/0 to 250 MCM |
2 |
3/O |
| D. Over 250 MCM |
4 |
350 MCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
6 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
1 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER FC SERVICE ENTRANCE IS NOT BONDED |
RSLV |
03/18/2011 |
03/18/2011 |
06/13/2011 |
| |
| 002 |
(999) |
OTHER FC NEUTRAL BAR IS NOT BONDED (250.28) |
RSLV |
03/18/2011 |
03/18/2011 |
06/13/2011 |
| |
| 003 |
(999) |
OTHER ENTIRE BUILDING - NEUTRAL BAR IS NOT BONDED AFTER SERVICE SWITCH(250.24.A5) |
RSLV |
03/18/2011 |
03/18/2011 |
06/13/2011 |
| |
| 004 |
(999) |
OTHER SERVICE ROOM PHASES AND NEUTRALS ARE NOT GROUPED TOGETHER |
RSLV |
03/18/2011 |
03/18/2011 |
06/13/2011 |
| |
| 005 |
(999) |
OTHER ROOF - OUTLET NOT PROVIDED WITHIN 25 FEET OF ROOF (210.63) |
RSLV |
03/18/2011 |
03/18/2011 |
06/13/2011 |
| |
| 006 |
( 30) |
OUTLET BOXES ARE NOT SECURED ROOF - DISCONNECT NOT SECURE FOR A/C ON ROOF |
RSLV |
03/18/2011 |
03/18/2011 |
06/13/2011 |
| |
| 007 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY SERVICE ROOM NO SUPPLEMENTAL GROUND |
RSLV |
03/18/2011 |
06/13/2011 |
07/14/2011 |