| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
1 |
|
| C. 201 Up to 600 AMPS |
1 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
18 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
3 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
13 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
1 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
4 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER 200 AND 400 AMP SERVICE SWITCHES NOT PROPERLY BONDED 250.92A |
RSLV |
07/09/2009 |
07/09/2009 |
11/01/2009 |
| |
| 002 |
(999) |
OTHER FEEDERS TO APTS NOT 60 AMPS 230.79D |
RSLV |
07/09/2009 |
07/09/2009 |
11/01/2009 |
| |
| 003 |
(999) |
OTHER NO ILLUMINATION PROVIDED IN SERVICE ROOM 110.26D |
RSLV |
07/09/2009 |
07/09/2009 |
11/01/2009 |
| |
| 004 |
( 53) |
GFCI HAS NOT BEEN PROVIDED NO GFCI PROVIDED ON ROOF FOR CENTRAL AC UNIT 210.8 |
RSLV |
07/09/2009 |
07/09/2009 |
11/01/2009 |
| |
| 005 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED A GROUND BAR USED AS NEUTRAL IN ALL PANELS 250.112 |
RSLV |
07/09/2009 |
07/09/2009 |
11/01/2009 |
| |
| 006 |
( 16) |
DEFECTIVE LIGHTING FIXTURES ARE IN USE DEFECTIVE FIXTURE ON ROOF AND INSIDE BUILDING 110.2A |
RSLV |
07/09/2009 |
07/09/2009 |
11/01/2009 |
| |
| 007 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED B OUTLETS THROUGHOUT APTS NOT GROUNDED 250.112 |
RSLV |
07/09/2009 |
07/09/2009 |
11/01/2009 |
| |
| 008 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER SERVICE EQUIPTMENT ENCLOSURE ARE NOT BONDED TOGETHER 400 AMP SERVICESWITCH NOT PROPERLY BONDED 250.92A |
RSLV |
11/01/2009 |
11/01/2009 |
11/12/2009 |
| |
| 009 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED FIXED EQUIPTMENT IS NOT PROPERLY GROUNDED OUTLETS THROUGHOUT APTSNOT GROUNDED |
RSLV |
11/01/2009 |
01/13/2010 |
03/08/2010 |