BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B286852
Premises: 508 FULTON STREET BROOKLYN BIN: 3000458     Block: 160   Lot: 18
   
Application Completed and Certified

Filed: 510 FULTON ST Census Tract:   37 Health Area:  2400
1ST FLOOR Admin Area:   B - BROOKLYN Inspection Area:   C
BROOKLYN, NY 11201 Community Board:   302
Special Place Name:   DOWNTOWN
DOB Cross Street(s):   BOND STREET,    HANOVER PLACE
Status:   C - JOB IS SIGNED OFF 02/15/2007
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  01/10/2007 6:38 AM
Application Entered:   01/10/2007 Job Start Date:   01/12/2007
Last Change:   02/15/2007 Job End Date:   02/15/2007
Appointment Status:   
Last Inspection By:   CAMPBELL, C       On     01/30/2007      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011394 Licensee Name: MICHAEL FARELLA
Firm: 002829 Firm Name: FARELLA ELECTRIC, INC.
Firm Phone: 718-256-8560  Firm Address: 3502 QUENTIN ROAD BROOKLYN NY 11234 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $45.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   K - Store
Store / Other:   SHOE STORE
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: RICH CHIAPPA
Authorized Representative:  RICH CHIAPPA
Relationship To Owner:   CUSTOMER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 30                        
Total Units : 30 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  REPLACING ELECTRICAL FIXTURES IN REMODELED PAYLESS SHOESTORE

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B286852
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 01/30/2007 02/05/2007 CLC C E (30) (0) Y
INSPECTION COMMENTS: N




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order