Electrical Application Details for App #: B277286
Premises: 1738 EAST 13 STREET BROOKLYN BIN: 3182865     Block: 6795   Lot: 24
   
Application Completed and Certified

Filed: 1738 E 13 ST Census Tract:   554 Health Area:  7320
BASMENT&1ST FL. Admin Area:   B - BROOKLYN Inspection Area:   T
BROOKLYN, NY 11229 Community Board:   315
Special Place Name:   DENTAL OFFICE
DOB Cross Street(s):   KINGS HIGHWAY,    AVENUE R
Status:   C - JOB IS SIGNED OFF 01/19/2007
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  03/23/2006 6:02 AM
Application Entered:   03/23/2006 Job Start Date:   04/10/2006
Last Change:   01/19/2007 Job End Date:   07/10/2006
Appointment Status:   
Last Inspection By:   COHN, MARTIN       On     12/20/2006      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011822 Licensee Name: MOHAMED H ABDOU
Firm: 003429 Firm Name: MOHAB ELECT'L CONTR'G COR
Firm Phone: 718-636-2222  Firm Address: 807 BERGEN STREET BROOKLYN NY 11238 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
2 - TEMPORARY CONSTRUCTION
6 - GENERAL WIRING
Total Fee:  $642.75
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   I - Hospital Or Health Facility
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: NATAN WEINER
Authorized Representative:  NATAN WEINER
Relationship To Owner:   OWNER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  3  
B. 101 Up to 200 AMPS  2  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  3  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  5  
D. Over 250 MCM  1  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  3  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  2  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 30  50    15  30                
Total Units : 125 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 3 #4-Wire 2 #10-Wire 0
Existing Meters 3 + New Meters 5 - Removed Meters 3 = Total Meters 5

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 03/23/2006 Notice:  
Power Issued: 03/23/2006 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  MARIO

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B277286
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 12/20/2006 12/27/2006 MC2 C E (70) (0) Y
INSPECTION COMMENTS: N