![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B247485 | ||
| Premises: 652 10 STREET BROOKLYN | BIN: 3026198 Block: 1095 Lot: 16 |
| Application Completed and Certified | ||
| Filed: | 652 10 ST | Census Tract: 167 | Health Area: 4600 | |
| BASEMENT - 3RD FLOOR | Admin Area: B - BROOKLYN | Inspection Area: F | ||
| BROOKLYN, NY 11215 | Community Board: 306 | |||
| DOB Cross Street(s): 8 AVENUE, PROSPECT PARK WEST | |||
| Status: C - JOB IS SIGNED OFF 11/15/2005 | |||
| Request Type: A - APPLICATION | eFiled: NO | ||
| Application Entered: 12/08/2003 | Job Start Date: 11/30/2003 | ||
| Last Change: 11/15/2005 | Job End Date: 02/10/2004 | ||
| Appointment Status: | |||
| Last Inspection By: BANYA, E On 11/09/2005 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: | |||
| License #: | 011199 | Licensee Name: | NICHOLAS V BALZANO | |
| Firm: | 002604 | Firm Name: | BALZANO ELECTRIC CORP. | |
| Firm Phone: | 718-788-1448 | Firm Address: | 4706 NEW UTRECHT AVENUE BROOKLYN NY 11219 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING |
Total Fee: $177.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: B - Two Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: | |||||||
| Owner / Occup: | ROBERT SLAYNER | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | 12 | 5 | 4 | 12 | 13 | |||||||
| Total Units : 46 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 2 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 12/08/2003 | Notice: | |
| Power Issued: | 12/08/2003 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 11/09/2005 | 11/15/2005 | EBA | C | E | (40) | (0) | Y | ||
| INSPECTION COMMENTS: | N | |||||||||