Electrical Application Details for App #: B235913
Premises: 372 WALLABOUT STREET BROOKLYN BIN: 3324774     Block: 2266   Lot: 12
   

DOB NOW: Inspections


Filed: 372 WALLABOUT ST Census Tract:   507 Health Area:  1500
CELLAR Admin Area:   B - BROOKLYN Inspection Area:   B
BROOKLYN, NY 11206 Community Board:   301
DOB Cross Street(s):   HARRISON AVENUE,    THROOP AVENUE
Status:   C - SIGNOFF IS AWAITING FEE PAYMENT 04/28/2025
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   02/05/2003 Job Start Date:   02/13/2003
Last Change:   04/28/2025 Job End Date:   04/30/2003
Appointment Status:   
Last Inspection By:   ERIC HIRSCH       On     04/28/2025      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 009252 Licensee Name: MORRIS HELLER
Firm: 000647 Firm Name: HELLER ELECTRIC CO., INC.
Firm Phone: 718-871-0800  Firm Address: 620 CONEY ISLAND AVE BROOKLYN NY 11218 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
Total Fee:  $265.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: BARDITCHER REALTY
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  10  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 10 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 02/05/2003 Notice:  
Power Issued: 02/05/2003 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  263937

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B235913
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/28/2025 04/28/2025 ECH C (1) (0) Y
INSPECTION COMMENTS: BKIR - SEE SUPERSEDING PERMIT B00964350