BIS Menu  |  Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B191899
Premises: 273 ALBANY AVENUE BROOKLYN BIN: 3388744     Block: 1376   Lot: 6
   

Filed: 273 ALBANY AV Census Tract:   339 Health Area:  4900
E008356 BSMT Admin Area:   B - BROOKLYN Inspection Area:   G
BROOKLYN, NY 11213 Community Board:   308
DOB Cross Street(s):   STERLING PLACE,    ST JOHNS PLACE
Status:   K - CLOSED/CANCELLED 03/29/2006
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   08/04/1999 Job Start Date:   06/26/1999
Last Change:   03/29/2006 Job End Date:   06/26/1999
Appointment Status:   
Last Inspection By:   LEITNER, L.       On     03/28/2006      
Field Disp:   K - OK TO CANCEL
Energize Recommendation:  
Objection Disposition:  

License #: 009873 Licensee Name: JOE MIDDLETON
Firm: 001933 Firm Name: NORWAY ELECTRIC CORP.
Firm Phone: 718-992-5500  Firm Address: 1205 JEROME AVENUE BRONX NY 10452 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
9 - OTHER
Total Fee:  $10.00
Other Work:   INSTALLED OME SEPARATE CIRCUIT LINE FOR BO
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup:
Owner Business Name: HPD
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  062273

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B191899
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 03/28/2006 03/29/2006 LEN K (1) (0)
INSPECTION COMMENTS: BLDG GUT REHAB SEE B260703