BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B105789
Premises: 5611 FT HAMILTON PARKWAY BROOKLYN BIN: 3139967     Block: 5688   Lot: 6
   
Application Completed and Certified

Filed: 5611 FORT HAMILTON PARKWAY Census Tract:   216 Health Area:  8010
1ST FL Admin Area:   B - BROOKLYN Inspection Area:   M
BROOKLYN, NY 11219 Community Board:   312
DOB Cross Street(s):    56 STREET,    57 STREET
Status:   C - JOB IS SIGNED OFF 08/21/1998
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   11/06/1992 Job Start Date:   11/04/1992
Last Change:   05/19/1998 Job End Date:   11/05/1992
Appointment Status:   
Last Inspection By:   O'HARE, R.J.       On     05/07/1998      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  R - REMOVED

License #: 010557 Licensee Name: REMER A FOY
Firm: 001743 Firm Name: AL FOY ELECTRIC
Firm Phone: 718-257-8511  Firm Address: 559 NEW LOTS AVENUE BROOKLYN NY 11207 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $167.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   K - Store
Store / Other:   MEAT STORE
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: FRANK SCARCELLA
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  2  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  3  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  1  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total          12           
Total Units : 19 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 1 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: K - CANCELLED Objection Flag: R - OBJECTION(S) RESOL
Power Requested: 12/29/1994 Notice:  12/29/1994
Power Issued: 11/06/1992 Response: W - OBJ TO BE REMOVED 01/05/1995

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B105789
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 02/08/1993 02/22/1993 BK1 A B (60) (2)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 06/04/1993 06/25/1993 JEP Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(3) 07/02/1993 07/20/1993 JEP Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(4) 07/30/1993 08/17/1993 LF1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(5) 08/27/1993 09/15/1993 LF1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(6) 09/24/1993 10/14/1993 LF1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(7) 10/22/1993 11/09/1993 LF1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(8) 11/19/1993 12/07/1993 LF1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(9) 01/14/1994 02/07/1994 LF1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(10) 02/11/1994 03/02/1994 LF1 Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(11) 06/30/1994 07/05/1994 PCM N (15) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(12) 07/29/1994 08/09/1994 FWE Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(13) 12/23/1994 12/29/1994 RJO H X B (35) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(15) 05/05/1995 05/25/1995 RJO Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(16) 06/09/1995 06/17/1995 RJO P (30) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(17) 05/22/1997 05/28/1997 RJO P (60) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(18) 08/08/1997 08/20/1997 RJO Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(19) 05/07/1998 05/19/1998 RJO C R E (50) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back