Electrical Application Details for App #: B084757
Premises: 126 BAY 25 STREET BROOKLYN BIN: 3167872     Block: 6409   Lot: 49
  Printable (PDF) version of this Permit  

DOB NOW: Inspections


Filed: 126 BAY 25 ST Census Tract:   286 Health Area:  8400
APT 6 3 FLOOR Admin Area:   B - BROOKLYN Inspection Area:   N
BROOKLYN, NY 11214 Community Board:   311
DOB Cross Street(s):   BENSON AVENUE,    BATH AVENUE
Status:   E - ABANDONED 08/22/2025
Request Type:   C - COMPLAINT eFiled:   NO
Application Entered:   05/29/1991 Job Start Date:   07/22/1991
Last Change:   08/22/2025 Job End Date:   07/24/1991
Appointment Status:   
Last Inspection By:   ADMINISTRATION       On     11/05/1999      
Field Disp:   J - JOB IN PROGRESS
Energize Recommendation:  G - NO COMMENT
Objection Disposition:  R - REMOVED

License #: 010301 Licensee Name: JOHN INGRAVALLO
Firm: 002002 Firm Name: ALPINE ELECTRICAL INC.
Firm Phone: 718-331-7773  Firm Address: 1448 65TH STREET BROOKLYN NY 11219 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $5.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   C - Three Family
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: GASPER ERRANTE
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                 
Total Units : 9 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag: R - OBJECTION(S) RESOL
Power Requested: Notice:  07/29/1991
Power Issued: Response: F - FILED TO REMOVE OBJECTION 07/31/1991

Follow-Up: F - FILED TO REMOVE OBJECTION 07/31/1991
Wires Comments: REMOVE VIOL B084757
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B084757
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/30/1991 06/19/1991 MX1 W (55) (8)
INSPECTION COMMENTS: CALL DIDN'T CHECK ALL APT. OR BSMT
 
(2) 10/10/1992 10/14/1992 LF1 J R G (45) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application