![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B060602 | ||
| Premises: 674 85 STREET BROOKLYN | BIN: 3153228 Block: 6037 Lot: 39 |
| Application Completed and Certified | ||
| Filed: | 676 85 ST | Census Tract: 140 | Health Area: 7910 | |
| BASEMENT | Admin Area: B - BROOKLYN | Inspection Area: S | ||
| BROOKLYN, NY 11228 | Community Board: 310 | |||
| DOB Cross Street(s): DYKER PLACE, 7 AVENUE | |||
| Status: C - JOB IS SIGNED OFF 10/25/1990 | |||
| Request Type: A - APPLICATION | eFiled: NO | ||
| Application Entered: 11/30/1989 | Job Start Date: 11/24/1989 | ||
| Last Change: 10/24/1990 | Job End Date: 12/30/1989 | ||
| Appointment Status: | |||
| Last Inspection By: GOTTLEIB, H. On 10/11/1990 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: | |||
| License #: | 010203 | Licensee Name: | STEPHEN J TATE | |
| Firm: | 001380 | Firm Name: | STEPHEN TATE ELECT. CORP. | |
| Firm Phone: | 212-921-5601 | Firm Address: | 256 WEST 38TH STREET NEW YORK NY 10018 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY |
Total Fee: $23.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: A - One Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: | |||||||
| Owner / Occup: | LENNY LEONE | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 1 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 11/30/1989 | Notice: | |
| Power Issued: | 11/30/1989 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Wires Comments: INSTALLATION OF ABSENT T LAND LOARD METER | |||
| Contractor's Comments: | |||
|
|