BIS Menu  |  Comments  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: B051203
Premises: 500 FLATBUSH AVENUE BROOKLYN BIN: 3114563     Block: 5024   Lot: 49
   
Application Completed and Certified

Filed: 500 FLATBUSH AV Census Tract:   327 Health Area:  4800
BSMT 1-2-3 Admin Area:   B - BROOKLYN Inspection Area:   G
BROOKLYN, NY 11225 Community Board:   309
DOB Cross Street(s):   EMPIRE BOULEVARD,    LEFFERTS AVENUE
Status:   C - JOB IS SIGNED OFF 04/24/1990
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   04/10/1989 Job Start Date:   04/15/1989
Last Change:   03/14/1990 Job End Date:   05/15/1989
Appointment Status:   
Last Inspection By:   COEN, MICHAEL       On     03/01/1990      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  R - REMOVED

License #: 009882 Licensee Name: J RISHIK
Firm: 000733 Firm Name: J.R.C. ELECTRIC, INC.
Firm Phone: 212-665-5436  Firm Address: 370 EAST 134TH STREET BRONX NY 10454 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $5.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   K - Store
Store / Other:   UNOCCUPIED
Special Cert Approval:  
Advisory Board Approval:  
Owner / Occup: MICHAEL ALLI
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 1 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: K - CANCELLED Objection Flag: R - OBJECTION(S) RESOL
Power Requested: 02/05/1990 Notice:  02/05/1990
Power Issued: 04/10/1989 Response: R - REINSPECTION 02/20/1990

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: B051203
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 04/28/1989 05/15/1989 JAN Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(2) 06/23/1989 07/10/1989 JAN Z (0) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(3) 08/04/1989 08/22/1989 JAN Z (1) (0)
INSPECTION COMMENTS: No Inspection Comments For This Application
 
(4) 09/21/1989 10/06/1989 MC1 A B (45) (1)
INSPECTION COMMENTS: *SS IN ALL APT PANELS
 
(5) 01/23/1990 02/05/1990 MC1 A R B (45) (2)
INSPECTION COMMENTS: NONE
 
(6) 03/01/1990 03/14/1990 MC1 C R E (40) (0)
INSPECTION COMMENTS: /




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Comments  |  Electrical Inspection Work Order  |  Back