| BUILDING OVERVIEW |
Are Feeders Being Installed? : |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
1 |
|
| D. Over 250 MCM |
0 |
|
| SUB FEEDERS (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
8 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| |
| (1) |
04/08/1988 |
04/15/1988 |
MF1 |
N |
|
|
(154) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (2) |
05/02/1988 |
05/09/1988 |
MF1 |
N |
|
|
(15) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (3) |
05/31/1988 |
06/06/1988 |
MF1 |
V |
|
B |
(240) |
|
(3) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (4) |
08/08/1988 |
08/22/1988 |
MF1 |
V |
R |
E |
(60) |
|
(4) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (5) |
12/07/1988 |
12/13/1988 |
MF1 |
H |
X |
B |
(60) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (6) |
04/11/1989 |
04/18/1989 |
MF1 |
H |
X |
B |
(60) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (7) |
05/10/1991 |
06/03/1991 |
RJO |
Z |
|
|
(0) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (8) |
06/11/1991 |
06/19/1991 |
RJO |
N |
|
|
(20) |
|
(0) |
|
| INSPECTION COMMENTS:
|
LEFT CARD
|
| |
| (9) |
04/10/1992 |
04/14/1992 |
RJO |
N |
|
|
(55) |
|
(0) |
|
| INSPECTION COMMENTS:
|
L C APPOINTMENT
|
| |
| (10) |
04/22/1992 |
04/28/1992 |
MC1 |
N |
|
|
(30) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (11) |
04/27/1992 |
05/11/1992 |
RJO |
H |
Y |
B |
(40) |
|
(0) |
|
| INSPECTION COMMENTS:
|
C.T.O. #1&22 SER GRD NOT PROPER AT PIPE
|
| |
| (12) |
04/02/1993 |
04/07/1993 |
RJO |
H |
X |
B |
(25) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|
| |
| (13) |
06/01/1994 |
06/08/1994 |
LEN |
H |
X |
|
(45) |
|
(0) |
|
| INSPECTION COMMENTS:
|
No Inspection Comments For This Application
|