![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: A369766 | ||
| Premises: 142-20 FRANKLIN AVENUE QUEENS | BIN: 4117051 Block: 5182 Lot: 19 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 142-20 FRANKLIN AV | Census Tract: 857 | Health Area: 1200 | |
| APT # 5I, 5J, 5P, 2G, 2T | Admin Area: A - QUEENS | Inspection Area: B | ||
| QUEENS, NY 11355 | Community Board: 407 | |||
| DOB Cross Street(s): UNION STREET, BOWNE STREET | |||
| Status: C - JOB IS SIGNED OFF 08/22/2018 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 11/21/2017 11:46 PM | |
| Application Entered: 11/21/2017 | Job Start Date: 11/21/2017 | ||
| Last Change: 08/22/2018 | Job End Date: 07/15/2018 | ||
| Appointment Status: | |||
| Last Inspection By: BASDEO, C On 03/12/2018 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011485 | Licensee Name: | BENJAMIN DREBIN | |
| Firm: | 002950 | Firm Name: | ACCURATE ELEC'L CORP. | |
| Firm Phone: | 718-606-9181 | Firm Address: | 11-07 43RD ROAD LONG ISLAND CITY NY 11101 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $162.50 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | MAIR BOUSKILLA | ||||||
| Owner Business Name: | FRANKLIN 88 LLC | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| 002 | 2G | 8 | 15 | 1 | 8 | 8 | ||||||
| 002 | 2T | 8 | 15 | 1 | 8 | 8 | ||||||
| 005 | 5I | 8 | 15 | 1 | 8 | 8 | ||||||
| 005 | 5J | 8 | 15 | 1 | 8 | 8 | ||||||
| 005 | 5P | 8 | 15 | 1 | 8 | 8 | ||||||
| Buildings Total | 40 | 75 | 5 | 40 | 40 | |||||||
| Total Units : 200 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: B1C2I3M4E5N6T7- APTS 5I , 5J , 5P , 2G , 2T | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 03/12/2018 | 03/12/2018 | COB | C | (36) | (0) | Y | |||
| INSPECTION COMMENTS: | INSPECTION OK | |||||||||