| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
3 |
3 100 AMP S.S. |
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
2 |
2 SETS 6-3 RISERS |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
3 |
3 12-24 CKT BKR PANELS |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER (FLOOR: 001) 1 & 2 FLOOR:MICRO/HOOD RECE NOT SINGLE 422.16(C) |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 002 |
( 41) |
LOCKNUTS ARE NOT MADE UP TIGHT (ALL FLOORS) BASEM. PANEL, UNDER KITCHEN SINK GFCI BOX |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 003 |
(999) |
OTHER (ALL FLOORS)BASEM. & 1FL.: RECEPTACLES IN MULLBERY COVERS NOT MOUNTED WITH 2SCREWS 406.4(C) |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 004 |
(999) |
OTHER (ALL FLOORS)1 & 2 FLOOR: PENINSULA RECEPTACLES NOT LOCATED AS PER 210.52 |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 005 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER (BASEMENT) IN SERV. DISCS & LINE SIDE TROUGH |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 006 |
( 19) |
DEFECTIVE WIRING IS IN USE (BASEMENT) GEC CONDUIT ZIPTIED TO WATER PIPE IN CLOSET |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 007 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT) IN LEFT HANDSIDE SERVICE DISCONNECT |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 008 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT) GEC TRIPLE FOLDED UNDER PIPE END BONDING CONNECTORS |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 009 |
( 53) |
GFCI HAS NOT BEEN PROVIDED (BASEMENT) ALL RECEPTACLES |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 010 |
(999) |
OTHER (BASEMENT)GFCI BOX SETT TOO DEEP IN BOILER ROOM BEHIND FRONT BOILER 314.20 |
RSLV |
07/24/2018 |
07/24/2018 |
09/19/2018 |
| |
| 011 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (BASEMENT) INTERSYSTEM BONDING BAR NOT CONNECTED TO ANYTHING |
RSLV |
08/21/2018 |
08/21/2018 |
09/19/2018 |
| |
| 012 |
( 19) |
DEFECTIVE WIRING IS IN USE (BASEMENT) GEC TERMINATION ON GROUND ROD 110.3 |
RSLV |
08/21/2018 |
08/21/2018 |
09/19/2018 |
| |
| 013 |
(280) |
MAIN BONDING JUMPER IS DEFECTIVE (BASEMENT) MBJ SCREWS NOT TIGHT |
RSLV |
08/21/2018 |
08/21/2018 |
09/19/2018 |
| |
| 014 |
( 19) |
DEFECTIVE WIRING IS IN USE (BASEMENT)310.15 B, BREAKERS NEED TO BE DE-RATED BECAUSE OF TO MANY CURRENTCARRYING CONDUCTORS IN THE RACEWAY. |
RSLV |
09/19/2018 |
09/19/2018 |
09/24/2018 |