![]() |
![]() ![]() |
|
NYC Department of Buildings | ||
Electrical Application Details for App #: A365747 |
Premises: 327 BEACH 40 STREET QUEENS | BIN: 4531440 Block: 15830 Lot: 58 |
DOB NOW: Inspections | |||||||||||
Application Completed and Certified |
Filed: | 327 BEACH 40 ST | Census Tract: 992 | Health Area: 3800 | |
1ST FLOOR | Admin Area: A - QUEENS | Inspection Area: M | ||
QUEENS, NY 11691 | Community Board: 414 | |||
![]() | ![]() | ![]() | ![]() |
DOB Cross Street(s): ROCKAWAY BEACH BOULEVARD, BEACH CHANNEL DRIVE | |||
Status: C - JOB IS SIGNED OFF 09/07/2017 | |||
Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 08/14/2017 2:44 PM | |
Application Entered: 08/14/2017 | Job Start Date: 08/15/2017 | ||
Last Change: 09/07/2017 | Job End Date: 01/15/2018 |
![]() | ![]() | ![]() | ![]() |
Appointment Status: | |||
Last Inspection By: CAMPBELL, C On 09/06/2017 | |||
Field Disp: C - INSPECTION PASSED | |||
Energize Recommendation: | |||
Objection Disposition: R - REMOVED |
License #: | 011110 | Licensee Name: | JAMES PASTORE | |
Firm: | 003280 | Firm Name: | PACIFIC ELEC'L CONTR'G IN | |
Firm Phone: | 718-789-3562 | Firm Address: | 103-19 101ST AVENUE QUEENS NY 11416 |
Work Started or Filed by Others: NO | ||||||||
Work Category: R - REHABILITATION | Work To Be Done:
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT |
Total Fee: $0.00 | ||||||
Hurricane Sandy Damage: | ||||||||
Other Work: | ||||||||
Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
This Job Regulated by the NYC Energy Conservation Code: No |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ||
Building Used As: A - One Family | |||||||
Special Cert Approval: | |||||||
Advisory Board Approval: NOT APPLICABLE | |||||||
Owner / Occup: | JACKSON SHERRYANN | ||||||
Authorized Representative: | |||||||
Relationship To Owner: |
|
Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
ATT | A/C | |||||||||||
GND | 1 | |||||||||||
Buildings Total | 1 | |||||||||||
Total Units : 1 units |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | |
Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: |
Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
![]() | ![]() | ![]() | ![]() |
Power Auth Flag: | Objection Flag: | ||
Power Requested: | Notice: | 1 - FIRST NOTICE 08/31/2017 | |
Power Issued: | Response: |
![]() | ![]() | ![]() | ![]() |
Follow-Up: | K - (CLOSED) | ||
Contractor's Comments: WHEELCHAIR LIFT. |
|