| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
1X400AMP DIS SW |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
1 |
1SET OF #6 |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
6 |
2SET OF 500MCM,4SET 3/0 |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
2 |
2X36CKT PANELS |
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 53) |
GFCI HAS NOT BEEN PROVIDED (GROUND FLOOR)GFCI PROTECTION IS NOT PROVIDED FOR ALL OUTLETS BEHIND THE BAR TOPCOUNTER ON THE LEFT AND RIGHT SIDE OF THE SINK. ARTICLE # 210.8 |
OPEN |
05/07/2019 |
05/07/2019 |
|
| |
| 002 |
(999) |
OTHER (GROUND FLOOR)MIGB IS NOT PROVIDED FOR 400 AMP PANEL LINE SIDE BOUNDING. ART #250.94 |
OPEN |
05/07/2019 |
05/07/2019 |
|
| |
| 003 |
(999) |
OTHER (GROUND FLOOR)MIGB IS NOT PROVIDED FOR BOTH THREE PHASE WIRES IN THE TOP OF THEPANEL. CONCENTRIC KO IS BROKEN, LOCK NUT IS ATTACHED TO CABLE ANDWENT UP ABOVE THE PANEL (HOLE) |
RSLV |
05/07/2019 |
05/07/2019 |
06/06/2019 |
| |
| 004 |
(999) |
OTHER (GROUND FLOOR)CONTRACTOR SHALL PROVIDE CIRCUIT FOR EMERGENCY EXIT SIGNS AND EMLIGHTING |
RSLV |
05/07/2019 |
05/07/2019 |
06/06/2019 |
| |
| 005 |
(999) |
OTHER (GROUND FLOOR)CONTRACTOR SHALL GAIN ACCESS UPON NEXT INSPECTION FOR THE MAIN 400AMP DISCONNECT. ( INSPECTOR PERFORMED BUILDING INSP 4/30/19 ANDBUILDING IS NOT PROPERLY GROUNDED ) |
OPEN |
05/07/2019 |
05/07/2019 |
|
| |
| 006 |
(999) |
OTHER (GROUND FLOOR)CONTRACTOR SHALL PROVIDED ACCESS FOR A/C UNITS AND ALL DEVICESAROUND THE A/C. |
OPEN |
05/07/2019 |
05/07/2019 |
|
| |
| 007 |
(999) |
OTHER (FLOOR: 001)ALL RECEPTACLES IN THE CUSTOMER SERVICE AREA NEEDS TO BE GFCIRECEPTACLES. |
OPEN |
06/06/2019 |
06/06/2019 |
|
| |
| 008 |
(999) |
OTHER (FLOOR: 001)NO ACCESS TO AC UNIT IN THE STORE OVER HEAD STORAGE AREA. |
OPEN |
06/06/2019 |
06/06/2019 |
|
| |
| 009 |
(999) |
OTHER (FLOOR: 001)314.20, EXTENSION COLLARS ARE NEEDED FOR RECEPTACLE IN THE WOODEDAREAS. |
OPEN |
06/06/2019 |
06/06/2019 |
|
| |
| 010 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER (BASEMENT) MIGB ARE MISSING IN THE TROUGH. |
OPEN |
06/06/2019 |
06/06/2019 |
|
| |
| 011 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT) SERVICE GROUND IS NOT CONTINUOUS. |
OPEN |
06/06/2019 |
06/06/2019 |
|