| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
3 |
100 AMP |
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
6 |
# 2 AWG |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
3 |
20-1 POLE BREAKER PANEL |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(128) |
NEUTRAL IS GROUNDED BEYOND LOAD SIDE OF SERVICE SWITCH (FLOOR: 002) PANEL, NEUTRALS TERMINATED ON GROUND BAR |
RSLV |
06/07/2017 |
06/07/2017 |
06/22/2017 |
| |
| 002 |
( 45) |
FIXTURE NOT INSTALLED IN AN APPROVED MANNER (FLOOR: 002)BATHROOM, FIXTURE NOT LISTED FOR WET LOCATION, INSTALLED IN SHOWERZONE |
RSLV |
06/07/2017 |
06/07/2017 |
06/22/2017 |
| |
| 003 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER (BASEMENT)SERVICE PANELS, CONCENTRIC KNOCK OUTS, BONDING BUSHINGS REQUIRED TOBOND ENCLOSURE |
RSLV |
06/07/2017 |
06/07/2017 |
06/22/2017 |
| |
| 004 |
( 35) |
APPROVED OUTLETS HAVE NOT BEEN PROVIDED FOR AIR CONDITIONERS (BASEMENT) RECREATING SPACE |
RSLV |
06/07/2017 |
06/07/2017 |
06/22/2017 |
| |
| 005 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT)WATER MAIN, GROUNDING CONDUCTOR SPLICED, STRANDED AT WATER MAIN ANDSOLID AT DETAIL BAR |
RSLV |
06/07/2017 |
06/07/2017 |
06/22/2017 |
| |
| 006 |
(999) |
OTHER (OPEN SPACE) GFCI RECEPTACLES, WR RECEPTACLES NOT PROVIDED |
RSLV |
06/07/2017 |
06/07/2017 |
06/22/2017 |
| |
| 007 |
( 19) |
DEFECTIVE WIRING IS IN USE (BASEMENT) LOCK NUTS ARE NOT MADE UP TIGHT ON THE SERVICE EQUIPMENT. |
RSLV |
06/22/2017 |
06/22/2017 |
07/12/2017 |
| |
| 008 |
( 19) |
DEFECTIVE WIRING IS IN USE (BASEMENT)WIRES ARE NOT COMPLETELY IN THE CONNECTORS ON THE FEEDER CABLES. |
RSLV |
06/22/2017 |
06/22/2017 |
07/12/2017 |
| |
| 009 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (BASEMENT)GROUNDING CONDUCTOR IS NOT CONTINUOUS COMING FROM WATER MAIN. |
RSLV |
06/22/2017 |
06/22/2017 |
07/12/2017 |