| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
1 |
200AMP FUSED DISCONNECT |
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
1 |
(3) 3/0 THHN E (1) #2 GND |
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
1 |
200 AMP PANEL |
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(122) |
THERE ARE MORE THAN SIX SETS OF DISCONNECTS PER SERVICE (BASEMENT)THEIR ARE MORE THAN THE REQUIRED AMOUNT OF SERVICE SWITCHES ALLOWEDART 230.71A |
RSLV |
10/27/2017 |
10/27/2017 |
06/24/2019 |
| |
| 002 |
(129) |
SERVICE SWITCH NEUTRAL NOT BONDED TO ENCLOSURE (BASEMENT) NEUTRAL NOT BONDED TO ENCLOSURE |
RSLV |
10/27/2017 |
10/27/2017 |
06/24/2019 |
| |
| 003 |
( 6) |
FEEDER DIAGRAM DID NOT ACCOMPANY APPLICATION FOR INSPECTION (BASEMENT) FEEDER DIAGRAM IS REQUIRED FOR INSPECTION |
RSLV |
10/27/2017 |
10/27/2017 |
06/24/2019 |
| |
| 004 |
(999) |
OTHER (BASEMENT) 200 AMP SERVICE SWITCH NO GEC TO WATER MAIN ART 250.24A1 |
RSLV |
10/27/2017 |
10/27/2017 |
06/24/2019 |
| |
| 005 |
(999) |
OTHER (BASEMENT) MORE THAN TWO(2) WIRES UNDER ONE(1) SPLIT BOLT ART 110.3 |
RSLV |
10/27/2017 |
10/27/2017 |
06/24/2019 |
| |
| 006 |
(999) |
OTHER (BASEMENT) CARD BOARD USED AS COVER FOR LIVE METER PAN ART 110.3 |
RSLV |
10/27/2017 |
10/27/2017 |
06/24/2019 |
| |
| 007 |
(128) |
NEUTRAL IS GROUNDED BEYOND LOAD SIDE OF SERVICE SWITCH (BASEMENT) DISCONNECTS AND METER PANS |
OPEN |
06/24/2019 |
06/24/2019 |
|
| |
| 008 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER (OPEN SPACE) 400 A SERVICE SWITCH, LINE SIDE NOT BONDED |
OPEN |
06/24/2019 |
06/24/2019 |
|
| |
| 009 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (OPEN SPACE)400 A SERVICE SWITCH, GROUNDING CONDUCTOR TO BE 1/0 AND TO BETERMINATED ON NEUTRAL BAR |
OPEN |
06/24/2019 |
06/24/2019 |
|
| |
| 010 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (OPEN SPACE) 400 A SERVICE SWITCH, NO GROUND ROD INSTALLED |
OPEN |
06/24/2019 |
06/24/2019 |
|