| NYC Department of Buildings | ||
| Electrical Application Details for App #: A355235 | ||
| Premises: 14-55 31 AVENUE QUEENS | BIN: 4595613 Block: 534 Lot: 3 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 14-53 31 AV | Census Tract: 79 | Health Area: 0300 | |
| TEMP | Admin Area: A - QUEENS | Inspection Area: A | ||
| QUEENS, NY 11106 | Community Board: 401 | |||
| Related Job Number: 420967421 | |||
| DOB Cross Street(s): 14 STREET, 21 STREET | |||
| Status: C - JOB IS SIGNED OFF 01/08/2021 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 10/26/2016 4:52 PM | |
| Application Entered: 10/26/2016 | Job Start Date: 10/26/2016 | ||
| Last Change: 01/08/2021 | Job End Date: 09/30/2017 | ||
| Appointment Status: | |||
| Last Inspection By: GLENN BALZARANO On 01/07/2021 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011827 | Licensee Name: | JOSEPH P CANTALINO | |
| Firm: | 004046 | Firm Name: | RIGHTWAY ELECTRICAL INC | |
| Firm Phone: | 212-334-6918 | Firm Address: | 18 ORCHARD STREET, 1ST FL NEW YORK NY 10002 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: N - NEW BUILDING | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 2 - TEMPORARY CONSTRUCTION T - TEMPORARY LIGHT & POWER |
Total Fee: $215.75 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | ANTHONY HU | ||||||
| Owner Business Name: | CENTENNIAL ASTORIA LLC | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| CEL | 5 | 2 | 10 | |||||||||
| 001 | 5 | 2 | 10 | |||||||||
| 002 | 5 | 2 | 10 | |||||||||
| 003 | 5 | 2 | 10 | |||||||||
| 004 | 5 | 2 | 10 | |||||||||
| 005 | 5 | 2 | 10 | |||||||||
| 006 | 5 | 2 | 10 | |||||||||
| 007 | 5 | 2 | 10 | |||||||||
| 008 | 5 | 2 | 10 | |||||||||
| Buildings Total | 45 | 18 | 90 | |||||||||
| Total Units : 153 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 1 | |
| Existing Meters | 0 | + New Meters | 1 | - Removed Meters | 0 | = Total Meters | 1 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 10/26/2016 | Notice: | |
| Power Issued: | 10/26/2016 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 01/07/2021 | 01/08/2021 | GBZ | C | (150) | (0) | Y | |||
| INSPECTION COMMENTS: | PASS | |||||||||