BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A350308
Premises: 202-18 45 AVENUE QUEENS BIN: 4125215     Block: 5544   Lot: 13
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 202-18 45 AV Census Tract:   1463 Health Area:  2121
CELLAR, 1, 2 FLOOR Admin Area:   A - QUEENS Inspection Area:   E
QUEENS, NY 11361 Community Board:   411
Related Job Number:    421262369
DOB Cross Street(s):    202 STREET,    203 STREET
Status:   C - JOB IS SIGNED OFF 01/23/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/16/2016 2:21 PM
Application Entered:   06/16/2016 Job Start Date:   06/16/2016
Last Change:   01/23/2017 Job End Date:   12/31/2016
Appointment Status:   
Last Inspection By:   ASHMAN, K.       On     01/21/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010804 Licensee Name: SANG CHEUNG
Firm: 002065 Firm Name: AL-LECTRIC ELECT'L CONTRG
Firm Phone: 212-219-3336  Firm Address: 137 CHRYSTIE STREET NEW YORK NY 10002 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
7 - HVAC WIRING
Total Fee:  $157.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   O - Office Bldg
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: ESTHER LEE
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  3  3-100 AMP 2 P
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  1  1-1/0
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  2  2-100 AMP PNL
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
CEL    12               
001    20    20             
002    20  12    20  10         
Buildings Total 44  32    12  44     10           
Total Units : 142 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 3 #4-Wire 0 #10-Wire 0
Existing Meters 1 + New Meters 3 - Removed Meters 1 = Total Meters 3

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 06/16/2016 Notice:  
Power Issued: 06/16/2016 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A350308
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 01/21/2017 01/23/2017 KAS C (10) (0) Y
INSPECTION COMMENTS: PASS




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Plumb. Inspections  |  Electrical Inspection Work Order  |  Back