| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
1 |
600A 3PHASE |
| E. Over 1200 AMPS |
3 |
2-800A, 1-1200A |
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
47 |
(45)#4 THHN & (2)#6 THHN |
| B. Over #2 to 1/0 |
3 |
#3 THHN |
| C. Over 1/0 to 250 MCM |
7 |
#3/0 THHN |
| D. Over 250 MCM |
141 |
4-#400,6-#500,2#600,2-350 |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
47 |
125A MLO 30 CIRCUIT |
| C. 3 Phase Up to 225 AMPS |
7 |
200A MLO 42 CIRCUIT |
| D. 3 Phase Over 225 AMPS |
1 |
800A MDP |
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
1 |
100A |
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
12 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER (BASEMENT)SERVICE ROOM, FIRE ALARM FUSE CUT OUT, LINE SIDE NOT BONDED |
RSLV |
06/22/2016 |
06/22/2016 |
07/27/2016 |
| |
| 002 |
(999) |
OTHER (BASEMENT)SERVICE ROOM, GROUNDING RACEWAY NOT CONTINUOUS TO COPPER DETAIL -250.64(E) |
RSLV |
06/22/2016 |
06/22/2016 |
07/27/2016 |
| |
| 003 |
(999) |
OTHER (BASEMENT) SERVICE ROOM, DOORS, PANIC BAR NOT PROVIDED - 110.26.C.2 |
RSLV |
06/22/2016 |
06/22/2016 |
07/27/2016 |
| |
| 004 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (ROOF) GENERATOR, GROUNDING CONDUCTOR TO WATER MAIN REQUIRED |
RSLV |
06/22/2016 |
06/22/2016 |
07/27/2016 |