| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
- |
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
1 |
600A |
| D. 601 Up to 1200 AMPS |
0 |
- |
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
7 |
4 - #3AWG |
| B. Over #2 to 1/0 |
1 |
4 - #1AWG |
| C. Over 1/0 to 250 MCM |
1 |
4 - 2/0 |
| D. Over 250 MCM |
4 |
4- 350MCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
1 |
24 CIRCUIT PANEL |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER (CELLAR) IN SERV. DISC. & END LINE BOX NOT SIZED AS PER 250.66 |
RSLV |
11/15/2016 |
11/15/2016 |
05/03/2017 |
| |
| 002 |
(109) |
SUFFICIENT WORK SPACE IS NOT PROVIDED/MAINTAINED (CELLAR) FRONT OF 600A SERV. DISC. |
OPEN |
11/15/2016 |
11/15/2016 |
|
| |
| 003 |
(125) |
PROTECTION OF CONDUCTORS NOT INSTALLED AS PER CODE (CELLAR) NEW 200A DISCONNECT |
OPEN |
11/15/2016 |
11/15/2016 |
|
| |
| 004 |
(128) |
NEUTRAL IS GROUNDED BEYOND LOAD SIDE OF SERVICE SWITCH (CELLAR) IN ALL (9) SECONDARY 100A & 200A SWITCHESSWITCHES |
RSLV |
11/15/2016 |
11/15/2016 |
05/03/2017 |
| |
| 005 |
(129) |
SERVICE SWITCH NEUTRAL NOT BONDED TO ENCLOSURE (CELLAR) 600A SERV. DISC. |
OPEN |
11/15/2016 |
11/15/2016 |
|
| |
| 006 |
(132) |
EQUIPMENT/MATERIAL IS NOT PROPERLY GROUNDED (CELLAR) IN 600A SERV DISC. NOT SIZED AS PER 250.122 |
OPEN |
11/15/2016 |
11/15/2016 |
|
| |
| 007 |
( 19) |
DEFECTIVE WIRING IS IN USE (CELLAR) LOAD SIDE PARALLEL 350-S NOT AS PER 310.4 |
OPEN |
11/15/2016 |
11/15/2016 |
|
| |
| 008 |
( 19) |
DEFECTIVE WIRING IS IN USE (CELLAR)#1AWG TAP FEEDER FOR EXISTING 200A DISC. LONGER THAN 10' 240.21 |
OPEN |
11/15/2016 |
11/15/2016 |
|
| |
| 009 |
( 19) |
DEFECTIVE WIRING IS IN USE (CELLAR) GEC NOT SUPPORTED |
RSLV |
11/15/2016 |
11/15/2016 |
05/03/2017 |
| |
| 010 |
( 5) |
SERVICE GROUNDING CONDUCTOR HAS NOT BEEN INSTALLED PROPERLY (CELLAR) NOT SIZED AS PER 250.66 |
RSLV |
11/15/2016 |
11/15/2016 |
05/03/2017 |
| |
| 011 |
(999) |
OTHER (CELLAR) 600A SERV. DISC NOT MARKED |
RSLV |
11/15/2016 |
11/15/2016 |
05/03/2017 |
| |
| 012 |
(125) |
PROTECTION OF CONDUCTORS NOT INSTALLED AS PER CODE (BASEMENT)CORNER 100A DISCONNECT (3557 CRECENT) OVERFUSED, 100AOCPD ON #6AWG |
OPEN |
05/03/2017 |
05/03/2017 |
|
| |
| 013 |
( 19) |
DEFECTIVE WIRING IS IN USE (BASEMENT)IN TROUGH: MULTIPLE CONDUCTORS UNDER SPLIT BOLTS & IN INDIVIDUALHOLES OF POLARIS CONNECTORS 2110.14 |
OPEN |
05/03/2017 |
05/03/2017 |
|
| |
| 014 |
( 7) |
EMT IS NOT PROPERLY SUPPORTED (TYPE:EMT) (BASEMENT) CONDUIT TO EXISTING 200A DISCONNECT |
OPEN |
05/03/2017 |
05/03/2017 |
|