![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: A344774 | ||
| Premises: 120-55 QUEENS BOULEVARD QUEENS | BIN: 4052812 Block: 2274 Lot: 2 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 120-55 QUEENS BLVD | Census Tract: 216 | ||
| GROUND FLOOR | Admin Area: A - QUEENS | Inspection Area: H | ||
| QUEENS, NY 11415 | Community Board: 409 | |||
| Special Place Name: QUEENS BOROUGH HALL FORUM | ||||
| DOB Cross Street(s): CONNECTOR ROAD TO UNION TPKE EB, 82 AVENUE | |||
| Status: C - JOB IS SIGNED OFF 07/20/2016 | |||
| Request Type: A - APPLICATION | eFiled: NO | ||
| Application Entered: 01/06/2016 | Job Start Date: 01/08/2016 | ||
| Last Change: 07/20/2016 | Job End Date: 01/10/2016 | ||
| Appointment Status: | |||
| Last Inspection By: WONG, K. On 07/20/2016 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 011473 | Licensee Name: | JOHN MANNINO | |
| Firm: | 002318 | Firm Name: | UP TOWN ELECTRIC INC | |
| Firm Phone: | 718-359-8210 | Firm Address: | 516 INDUSTRIAL LOOP,SUITE 201 STATEN ISLAND NY 10309 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
6 - GENERAL WIRING |
Total Fee: $715.00 | ||||||
| Hurricane Sandy Damage: No | ||||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: O - Office Bldg | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: REQUIRED | |||||||
| Advisory Board Categories: K - 1000 KVA SERVICE | |||||||
| Advisory Board Approval #: 53315 Submittal #: 15A0512 | |||||||
| Owner / Occup: | JOSEPH WAGNER | ||||||
| Owner Business Name: | DCAS | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 1 - FIRST NOTICE 02/17/2016 | |
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|