Electrical Application Details for App #: A344307
Premises: 22-34 JACKSON AVENUE QUEENS BIN: 4596913     Block: 86   Lot: 1
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 22-44 JACKSON AV Census Tract:   19 Health Area:  0720
STREET LEVEL Admin Area:   A - QUEENS Inspection Area:   C
QUEENS, NY 11101 Community Board:   402
Related Job Number:    420651912
DOB Cross Street(s):    46 AVENUE,    23 STREET
Status:   C - JOB IS SIGNED OFF 07/27/2022
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  12/16/2015 1:18 PM
Application Entered:   12/16/2015 Job Start Date:   12/16/2015
Last Change:   07/27/2022 Job End Date:   12/16/2016
Appointment Status:   
Last Inspection By:   GLENN BALZARANO       On     07/27/2022      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 012593 Licensee Name: FARID J MARJI
Firm: 004424 Firm Name: NEW YORK EMPIRE ELECL CON
Firm Phone: 718-619-8181  Firm Address: 1236 JEROME AVENUE SERVICES INC BRONX NY 10452 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
T - TEMPORARY LIGHT & POWER
Total Fee:  $175.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   MIX USE
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: GERALD WOLKOFF
Owner Business Name: G & M REALTY
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  3  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  INSTALLING TEMPORARY HEAT TRACE

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A344307
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 07/27/2022 07/27/2022 GBZ C (20) (0) Y
INSPECTION COMMENTS: PASS RE:Q00521353 COVERS NORTH AND SOUTH TOWERS