![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: A343087 | ||
| Premises: 146-10 35 AVENUE QUEENS | BIN: 4113208 Block: 5004 Lot: 12 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 146-10 35 AV | Census Tract: 1163 | Health Area: 1310 | |
| TEMP | Admin Area: A - QUEENS | Inspection Area: B | ||
| QUEENS, NY 11354 | Community Board: 407 | |||
| Related Job Number: 402594554 | |||
| DOB Cross Street(s): 146 STREET, 147 STREET | |||
| Status: C - JOB IS SIGNED OFF 04/21/2023 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 11/09/2015 5:41 PM | |
| Application Entered: 11/09/2015 | Job Start Date: 11/09/2015 | ||
| Last Change: 04/21/2023 | Job End Date: 09/15/2016 | ||
| Appointment Status: | |||
| Last Inspection By: EVON GRANDISON On 04/20/2023 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 011827 | Licensee Name: | JOSEPH P CANTALINO | |
| Firm: | 004046 | Firm Name: | RIGHTWAY ELECTRICAL INC | |
| Firm Phone: | 212-334-6918 | Firm Address: | 18 ORCHARD STREET, 1ST FL NEW YORK NY 10002 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: N - NEW BUILDING | Work To Be Done:
2 - TEMPORARY CONSTRUCTION |
Total Fee: $53.25 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: Z - Commercial/Residential (1 Stores, 17 Apartments) | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | STEVE CHEUNG | ||||||
| Owner Business Name: | E HOME REAL ESTATE, LLC | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| CEL | 3 | 1 | 3 | |||||||||
| 001 | 3 | 1 | 3 | |||||||||
| 002 | 3 | 1 | 3 | |||||||||
| 003 | 3 | 1 | 3 | |||||||||
| 004 | 3 | 1 | 3 | |||||||||
| 005 | 3 | 1 | 3 | |||||||||
| 006 | 3 | 1 | 3 | |||||||||
| 007 | 3 | 1 | 3 | |||||||||
| 008 | 3 | 1 | 3 | |||||||||
| Buildings Total | 27 | 9 | 27 | |||||||||
| Total Units : 63 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|