![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: A339874 | ||
| Premises: 44-11 PURVES STREET QUEENS | BIN: 4595482 Block: 267 Lot: 7503 |
| DOB NOW: Inspections | |||||||||||
| Application Completed and Certified | |||||||||||
| Filed: | 44-11 PURVES ST | Census Tract: 19 | Health Area: 0720 | |
| BASEMENT AND ROOF | Admin Area: A - QUEENS | Inspection Area: C | ||
| QUEENS, NY 11101 | Community Board: 402 | |||
| DOB Cross Street(s): JACKSON AVENUE, DEAD END | |||
| Status: C - JOB IS SIGNED OFF 02/19/2016 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 07/27/2015 1:42 PM | |
| Application Entered: 07/27/2015 | Job Start Date: 07/27/2015 | ||
| Last Change: 02/19/2016 | Job End Date: 11/27/2015 | ||
| Appointment Status: | |||
| Last Inspection By: POMERICO, RAYMOND E On 01/26/2016 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: R - REMOVED | |||
| License #: | 012537 | Licensee Name: | RU W HUANG | |
| Firm: | 004357 | Firm Name: | ATMOS ELECTRIC SVCE CORP | |
| Firm Phone: | 718-888-1501 | Firm Address: | 15-25 132 STREET 2ND FLOOR COLLEGEPOINT NY 11356 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
E - SUSTAINABLE ENERGY - SOLAR |
Total Fee: $55.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | EXCEL BRADSHAW MGMT GROUP | ||||||
| Authorized Representative: ANTHONY PASSALACQUA | |||||||
| Relationship To Owner: PROJECT MANAGER | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | 1 - FIRST NOTICE 11/25/2015 | |
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: INSTALL SOLAR PV PANEL AND METER. INSTALL A FEEDER FROM BASEMENT TO ROOF. | |||
|
|