BIS Menu  |  DOB Violations  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A337749
Premises: 25-35 38 STREET QUEENS BIN: 4010259     Block: 654   Lot: 22
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 25-35 38 ST Census Tract:   143 Health Area:  0510
WHOLE HOUSE Admin Area:   A - QUEENS Inspection Area:   A
QUEENS, NY 11103 Community Board:   401
Related Job Number:    420957218
DOB Cross Street(s):   ASTORIA BOULEVARD SOUTH,    28 AVENUE
Status:   C - JOB IS SIGNED OFF 02/10/2016
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/19/2015 4:38 PM
Application Entered:   05/19/2015 Job Start Date:   05/20/2015
Last Change:   02/10/2016 Job End Date:   05/20/2016
Appointment Status:   
Last Inspection By:   ERIC HIRSCH       On     02/04/2016      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011452 Licensee Name: GARY C GELORUM
Firm: 002905 Firm Name: G. G. ELECTRIC CORP.
Firm Phone: 718-518-2923  Firm Address: 202 NORMAN AVENUE BROOKLYN NY 11222 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $411.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   7-FAMILY
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: CHAGIAS PETER
Owner Business Name: SPARTAN MANAGEMENT LLC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  200 AMP
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  7  7- SETS 8/3 COPPER
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  1-SET 3/0 COPPER
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  7  APTS
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
BAS  BASE  10  10  10             
001  1A  10  15  10             
001  1B  10  15  10             
002  2A  10  15  10             
002  2B  10  15  10             
003  3A  10  15  10             
003  3B  10  15  10             
004  4FL  10  20  10  10             
Buildings Total 80  120  16  60  80                
Total Units : 356 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 7 #4-Wire 1 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 05/19/2015 Notice:  
Power Issued: 05/19/2015 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A337749
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 02/04/2016 02/04/2016 ECH C (72) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  DOB Violations  |  Electrical Inspection Work Order  |  Back