| BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
0 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
1 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
39 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
2 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
39 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 46) |
PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY (ALL FLOORS) PANELS MUST HAVE LEGIBLE DIRECTORIES |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 002 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED (ALL FLOORS) HOT WATER RECEPTACLE IN CLOSETS |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 003 |
( 6) |
FEEDER DIAGRAM DID NOT ACCOMPANY APPLICATION FOR INSPECTION (ALL FLOORS) LOAD CALCULATION REQUIRED 215.5 |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 004 |
(999) |
OTHER (ALL FLOORS) KO SEALS NOT CLOSED IN ALL 1ST FL AND ROOF PANELS |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 005 |
(999) |
OTHER (ALL FLOORS)UNDER CABINET LIGHTING 120V AND DC SHARE BOX AND CONNECTOR, DC WIRENOT RATED FOR 120V - 300.3(C) |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 006 |
(999) |
OTHER (ALL FLOORS)UNDER CABINET LIGHT DRIVER NOT INSTALLED PER SPEC. CORD IS CUT 110.3 |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 007 |
(999) |
OTHER (ALL FLOORS)ALL APARTMENT LAUNDRY CLOSETS LACK RECEPTACLES 210.52(F) (ARC-FAULTPROTECTION REQ.) |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 008 |
( 29) |
OUTLET BOXES ARE NOT COVERED (GROUND FLOOR) J-BOXES OPEN THROUGHOUT GROUND FLOOR |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 009 |
(999) |
OTHER (GROUND FLOOR)FIRE PUMP SERVICE SWITCH FUSED HIGHER THAN 600% -- AMENDMENT 695.4 |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 010 |
(999) |
OTHER (GROUND FLOOR) TEMP WIRING HAS NOT BEEN REMOVED IN GARAGE 590.3 |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 011 |
(999) |
OTHER (GROUND FLOOR)COMMUNICATION WIRING NOT TO BE INSTALLED IN ELECTRICAL SERVICE ROOMAMENDMENT 800.133(D) |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 012 |
(999) |
OTHER (GROUND FLOOR) FLUORESCENT LIGHTS DO NOT HAVE DISCONNECTS 410.130(G) |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 013 |
(999) |
OTHER (GROUND FLOOR)EMT PASSES THROUGH FLUORESCENT LIGHT FIXTURES IN GARAGE 110.2 |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 014 |
(999) |
OTHER (GROUND FLOOR)LIGHT FIXTURES ON GROUND FLOOR LACK GROUND PATHWAY 250.4 |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |
| |
| 015 |
( 17) |
DEFECTIVE SWITCHES ARE IN USE (ROOF) HEATER ROOM 3 WAY SWITCHES |
RSLV |
05/04/2016 |
05/04/2016 |
06/02/2016 |