| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
4 |
|
| B. 101 Up to 200 AMPS |
1 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
3 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
1 |
|
| D. Over 250 MCM |
0 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
4 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
0 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
(999) |
OTHER (FLOOR: 001) FLOORS 1&2-410.10(D)-LOCATION OF HI HATS NEAR TUB EDGE |
RSLV |
02/01/2016 |
02/01/2016 |
03/31/2016 |
| |
| 002 |
(999) |
OTHER (FLOOR: 002) 406.8-"WR" RATED RECEPTACLES REQ'D. ON BALCONIES |
RSLV |
02/01/2016 |
02/01/2016 |
03/31/2016 |
| |
| 003 |
(999) |
OTHER (BASEMENT) 250.92-LINE SIDE BONDING (LOOSE, STRIPPED SCREW) |
RSLV |
02/01/2016 |
02/01/2016 |
03/31/2016 |
| |
| 004 |
(999) |
OTHER (BASEMENT) 408.4-PANEL PLP DIRECTORY REQUIRED |
RSLV |
02/01/2016 |
02/01/2016 |
03/31/2016 |
| |
| 005 |
(999) |
OTHER (BASEMENT)210.52(A)1-SPACING OF RECEPTACLES ON (BRICK) WALL INSUFFICIENT |
RSLV |
02/01/2016 |
02/01/2016 |
03/31/2016 |
| |
| 006 |
(999) |
OTHER (BASEMENT)210.11(C)1-MINIMUM 2 SMALL APPLIANCE CIRCUITS TO COUNTERTOP |
RSLV |
02/01/2016 |
02/01/2016 |
03/31/2016 |
| |
| 007 |
(999) |
OTHER (BASEMENT) 210.52(B)-INSUFFICIENT RECEPTACLES ON COUNTERTOP |
RSLV |
02/01/2016 |
02/01/2016 |
03/31/2016 |
| |
| 008 |
(999) |
OTHER (OPEN SPACE)210.52(E) GFCI "WR" RECEPTACLES REQUIRED FRONT AND REAR OF HOUSE |
RSLV |
02/01/2016 |
02/01/2016 |
03/31/2016 |