| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
1 |
1-60 FUSE CUT-OUT |
| B. 101 Up to 200 AMPS |
2 |
1-200A COMBO 1-150A FIRPM |
| C. 201 Up to 600 AMPS |
2 |
2-600A |
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
38 |
3#6 |
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
1 |
1 3/0 |
| D. Over 250 MCM |
4 |
4-350 MCM |
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
38 |
12 POLES |
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
1 |
42 POLES |
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BASEMENT SERVICE TROUGH BELOW 600A SERVICE SWITCH |
RSLV |
09/21/2015 |
09/21/2015 |
10/08/2015 |
| |
| 002 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BASEMENT SERVICE TROUGH AND TAP BOX NEXT TO 200A SERVICE SWITCH |
RSLV |
09/21/2015 |
09/21/2015 |
10/08/2015 |
| |
| 003 |
(999) |
OTHER BASEMENT FIRE PUMP SERVICE SWITCH NO NEUTRAL TO SWITCH 250.24(B) |
RSLV |
09/21/2015 |
09/21/2015 |
10/08/2015 |
| |
| 004 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BASEMENT FIRE PUMP SERVICE SWITCH LINE SIDE NOT BONDED |
RSLV |
09/21/2015 |
09/21/2015 |
10/08/2015 |
| |
| 005 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BASEMENT FUSE CUT-OUT,LINE SIDE NOT BONDED |
RSLV |
09/21/2015 |
09/21/2015 |
10/08/2015 |
| |
| 006 |
(999) |
OTHER SERVICE WHERE RACEWAYS CONTAIN 4 AWG OR LARGER CONDUIT NEED BUSHING TROUGH UNDERNEATH 600A SERVICE SWITCH 300.4(G) |
RSLV |
10/08/2015 |
10/08/2015 |
11/04/2015 |
| |
| 007 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER SERVICE BASEMENT FIRE PUMP SERVICE NOT BONDED LINE SIDE |
RSLV |
10/08/2015 |
10/08/2015 |
11/04/2015 |
| |
| 008 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BASEMENT SERVICE ROOM TROUGH FROM ENDLINE BOX TO LINE SIDE OF 600ASWITCHES BONDING LOCKNUT NOT PROVIDED |
RSLV |
11/04/2015 |
11/04/2015 |
11/20/2015 |
| |
| 009 |
( 1) |
SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER BASEMENT TROUGH LINE SIDE OF 600A SWITCH BONDING CONDUCTOR TO BE 2/0FOR TWO SETS 350 MCM |
RSLV |
11/04/2015 |
11/04/2015 |
11/20/2015 |
| |
| 010 |
(999) |
OTHER BASEMENT SERVICE ROOM DEDICATED SPACE ABOVE END LINE BOX AND 600ASERVICE SW SEWER LINE RUNS ABOVE EQUIP NO DRIP PAN PROVIDED 110.26F1 |
RSLV |
11/04/2015 |
11/04/2015 |
11/20/2015 |