BIS Menu  |  Elevators  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A311119
Premises: 319 BEACH 98 STREET QUEENS BIN: 4445407     Block: 16155   Lot: 21
   
Application Completed and Certified

Filed: 319 BEACH 98 ST Census Tract:   942.01 Health Area:  3700
BOILER ROOM Admin Area:   A - QUEENS Inspection Area:   M
QUEENS, NY 11694 Community Board:   414
DOB Cross Street(s):   BEACH 98 STREET,    CROSS BAY VET MEMORIAL BRIDGE ET
Status:   C - JOB IS SIGNED OFF 02/20/2015
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  01/24/2013 9:04 AM
Application Entered:   01/24/2013 Job Start Date:   01/24/2013
Last Change:   02/20/2015 Job End Date:   07/28/2013
Appointment Status:   
Last Inspection By:   BASDEO, C       On     02/12/2015      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011991 Licensee Name: ROLAND EDWARDS
Firm: 003719 Firm Name: KRAFT ELECTRIC CORP
Firm Phone: 718-220-2260  Firm Address: 2377 WASHINGTON AVENUE..FL 1 BRONX NY 10458 

Work Started or Filed by Others: YES
Work Category:   R - REHABILITATION Work To Be Done:  
T - TEMPORARY LIGHT & POWER
Total Fee:  $0.00
Hurricane Sandy Damage:   Yes
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: MITCHELL HUMMEL
Owner Business Name: MOBILE BOILER INC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  1  4# 6 AWG
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  TEMP WIRING TO MOBILE BOILER (TRAILER)

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A311119
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 02/12/2015 02/20/2015 COB C (65) (0) Y
INSPECTION COMMENTS: CERTIFY REMOVE NOT AT LOCATION AT TIME OF INSPECTION




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Elevators  |  Electrical Inspection Work Order  |  Back