BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A306076
Premises: 31-71 38 STREET QUEENS BIN: 4010505     Block: 658   Lot: 13
   
Application Completed and Certified

Filed: 31-71 38 ST Census Tract:   155 Health Area:  0520
ENTIRE BUILDING Admin Area:   A - QUEENS Inspection Area:   A
QUEENS, NY 11103 Community Board:   401
Related Job Number:    410006639
DOB Cross Street(s):    31 AVENUE,    BROADWAY
Status:   C - JOB IS SIGNED OFF 12/17/2013
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  10/19/2012 10:11 AM
Application Entered:   10/19/2012 Job Start Date:   11/01/2012
Last Change:   12/17/2013 Job End Date:   11/01/2013
Appointment Status:   
Last Inspection By:   THEODORE JUNSCH       On     12/12/2013      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011452 Licensee Name: GARY C GELORUM
Firm: 002905 Firm Name: G. G. ELECTRIC CORP.
Firm Phone: 718-518-2923  Firm Address: 202 NORMAN AVENUE BROOKLYN NY 11222 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
8 - BOILER/BURNER WIRING
Total Fee:  $548.75
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   Z - Other
Store / Other:   8-FAMILY
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: GEORGE ELLIOTT
Owner Business Name: ELLIOTT DEVT. CORP.
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  200 MB
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  8  #6
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  1 SET 3/0 COPPER
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  8  8 PANELS
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  1  40HP ELEVATOR
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
EPT                 
CEL                 
LOB                   
001  1A  10               
001  1B  15               
002  2A  15               
002  2B  15               
003  3A  15               
003  3B  15               
004  4A  15               
004  4B  15               
Buildings Total 57  119    52  57                
Total Units : 285 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 8 #4-Wire 1 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 10/19/2012 Notice:  
Power Issued: 10/19/2012 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A306076
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 11/14/2013 11/19/2013 FWE J E (90) (0) Y
INSPECTION COMMENTS: ELV WORK IN PROGRESS SERVICE AND APTS
 
(2) 12/12/2013 12/17/2013 TJ1 C E (45) (0) Y
INSPECTION COMMENTS: CERTIFICATE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order