Electrical Application Details for App #: A302322
Premises: 94-54 115 STREET QUEENS BIN: 4538539     Block: 9400   Lot: 29
   
Application Completed and Certified

Filed: 94-54 115 ST Census Tract:   118
ALL Admin Area:   A - QUEENS Inspection Area:   L
QUEENS, NY 11419 Community Board:   409
Related Job Number:    420339440
DOB Cross Street(s):   ATLANTIC AVENUE,    95 AVENUE
Status:   C - JOB IS SIGNED OFF 08/14/2013 Balance Paid By Owner
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  05/22/2012 10:38 PM
Application Entered:   05/22/2012 Job Start Date:   06/04/2012
Last Change:   08/14/2013 Job End Date:   03/28/2013
Appointment Status:   
Last Inspection By:   SAMARAS TASOS       On     05/31/2013      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011724 Licensee Name: OLIVER CHRISTOPHER
Firm: 003649 Firm Name: OMD ELECTRICAL CORP
Firm Phone: 718-443-1088  Firm Address: 1047 ROGERS AVENUE BROOKLYN NY 11226 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
8 - BOILER/BURNER WIRING
Total Fee:  $352.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   L - Five Or More Family
Special Cert Approval:   B - BOILER CONTROLS J-51 CERTIFICATION
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: BIMLA DEVI
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  7  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  7  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  6  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 7 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 7 - Removed Meters 0 = Total Meters 7

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 05/22/2012 Notice:  
Power Issued: 05/22/2012 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A302322
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 05/31/2013 06/04/2013 TS1 C E (20) (0) Y
INSPECTION COMMENTS: CERTIFICATE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  DOB Violations  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back