![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: A291161 | ||
| Premises: 149-23 118 STREET QUEENS | BIN: 4256908 Block: 11819 Lot: 25 |
| Application Completed and Certified | ||
| Filed: | 149-23 118 ST | Census Tract: 846.01 | Health Area: 3611 | |
| BSMT,1ST,2ND & OUTSIDE | Admin Area: A - QUEENS | Inspection Area: L | ||
| QUEENS, NY 11420 | Community Board: 410 | |||
| DOB Cross Street(s): 149 AVENUE, 150 AVENUE | |||
| Status: C - JOB IS SIGNED OFF 06/25/2012 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 12/06/2010 11:31 AM | |
| Application Entered: 12/06/2010 | Job Start Date: 12/06/2010 | ||
| Last Change: 06/25/2012 | Job End Date: 01/30/2011 | ||
| Appointment Status: | |||
| Last Inspection By: WEISBART, F. On 10/04/2011 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: | |||
| License #: | 011997 | Licensee Name: | CRAIG E SAMUELS | |
| Firm: | 003645 | Firm Name: | AMPERE ELECTRIC CORP | |
| Firm Phone: | 718-527-9324 | Firm Address: | 200-06 LINDEN BLVD ST. ALBANS NY 11412 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
1 - SERVICE WORK/NOTIFY UTILITY 6 - GENERAL WIRING 8 - BOILER/BURNER WIRING |
Total Fee: $211.75 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: B - Two Family | |||||||
| Special Cert Approval: B - BOILER CONTROLS J-51 CERTIFICATION | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | AMAL M BALMACOON | ||||||
| Authorized Representative: | |||||||
| Relationship To Owner: | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | BS | 5 | 5 | 3 | ||||||||
| 001 | 1ST | 25 | 30 | 3 | 13 | 25 | ||||||
| 002 | 2ND | 25 | 30 | 3 | 13 | 25 | ||||||
| Buildings Total | 55 | 65 | 6 | 29 | 50 | |||||||
| Total Units : 205 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 3 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 2 | + New Meters | 3 | - Removed Meters | 2 | = Total Meters | 3 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | |
| Power Requested: | 12/06/2010 | Notice: | |
| Power Issued: | 12/06/2010 | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: | |||
|
|
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 10/04/2011 | 10/11/2011 | FWE | C | E | (60) | (0) | Y | ||
| INSPECTION COMMENTS: | CERTIFICATE | |||||||||