BUILDING OVERVIEW |
Are Feeders Being Installed? : No |
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
Building Overview Work Items |
QUANTITY |
DESCRIPTION |
SERVICE SWITCHES |
|
A. Up to 100 AMPS |
0 |
|
B. 101 Up to 200 AMPS |
0 |
|
C. 201 Up to 600 AMPS |
0 |
|
D. 601 Up to 1200 AMPS |
0 |
|
E. Over 1200 AMPS |
0 |
|
SER. ENT. & FDR COND (EACH SET) |
|
A. Up to #2 CONDUCTOR |
0 |
|
B. Over #2 to 1/0 |
0 |
|
C. Over 1/0 to 250 MCM |
0 |
|
D. Over 250 MCM |
0 |
|
PANELS |
|
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
0 |
|
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
C. 3 Phase Up to 225 AMPS |
0 |
|
D. 3 Phase Over 225 AMPS |
0 |
|
ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
B. Each Additional 10 Floors Or Less |
0 |
|
BOILER CONTROLS |
0 |
|
OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
|
001 |
( 3) |
APPLICATION FOR CERTIFICATE OF ELECTRICAL INSPECTION NOT ON FILE BSMT,1ST,2ND FL THRU-OUT FIXTURE, SWITCHES, & RECEPTACLES |
RSLV |
03/19/2009 |
03/19/2009 |
04/30/2009 |
|
002 |
( 19) |
DEFECTIVE WIRING IS IN USE BSMT,1ST,2ND FL OPEN WIRING |
RSLV |
03/19/2009 |
03/19/2009 |
04/30/2009 |
|
003 |
( 53) |
GFCI HAS NOT BEEN PROVIDED BSMT ALL RECEPTACLES IN BSMT, 1ST & 2ND FL KITCHEN COUNTERTOPS & ALL BATHROOMS |
RSLV |
03/19/2009 |
03/19/2009 |
04/30/2009 |
|
004 |
( 59) |
AFCI PROTECTION HAS NOT BEEN PROVIDED 1ST & 2ND FL BEDROOMS RECEPTACLES, A/C RECEPTACLES & FIXTURES |
RSLV |
03/19/2009 |
03/19/2009 |
04/30/2009 |
|
005 |
( 22) |
FIXED EQUIPMENT IS NOT PROPERLY GROUNDED BSMT,1ST,2ND RECEPTACLES, SWITCHES NO GREEN WIRE FROM DEVICES TO BOX |
RSLV |
03/19/2009 |
03/19/2009 |
04/30/2009 |