BIS Menu  |  Electrical Inspection Work Order   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A274601
Premises: 18-25 PUTNAM AVENUE QUEENS BIN: 4082780     Block: 3462   Lot: 38
   
Application Completed and Certified

Filed: 18-25 PUTNAM AV Census Tract:   551 Health Area:  2300
BASEMENT Admin Area:   A - QUEENS Inspection Area:   G
QUEENS, NY 11385 Community Board:   405
DOB Cross Street(s):   SENECA AVENUE,    ONDERDONK AVENUE
Status:   C - JOB IS SIGNED OFF 02/23/2010
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  01/12/2009 11:36 AM
Application Entered:   01/12/2009 Job Start Date:   01/12/2009
Last Change:   02/23/2010 Job End Date:   01/12/2009
Appointment Status:   
Last Inspection By:   BOTSCH, E       On     01/11/2010      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 011552 Licensee Name: CHRISTOPHER MCDOUGALL
Firm: 003069 Firm Name: MCDOUGALL ELECTRIC, INC.
Firm Phone: 718-539-1700  Firm Address: 72-07 67TH STREET GLENDALE NY 11385 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
8 - BOILER/BURNER WIRING
Total Fee:  $52.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:   B - BOILER CONTROLS J-51 CERTIFICATION
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: LOUISE SHUSTER
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total                         
Total Units : 0 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  WIRE GAS BOILER

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A274601
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 01/11/2010 01/19/2010 EBT C (45) (0) Y
INSPECTION COMMENTS: CERTIFICATE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Inspection Work Order