Electrical Application Details for App #: A262546
Premises: 27-19 14 STREET QUEENS BIN: 4534928     Block: 540   Lot: 1
   
Application Completed and Certified

Filed: 14-06 27 AV Census Tract:   83 Health Area:  0300
1ST FLOOR Admin Area:   A - QUEENS Inspection Area:   A
QUEENS, NY 11102 Community Board:   401
Special Place Name:   ST. GEORGE CHURCH
Related Job Number:    402202157
DOB Cross Street(s):       
Status:   C - JOB IS SIGNED OFF 01/03/2008 Balance Paid By Owner
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  10/19/2007 2:40 PM
Application Entered:   10/19/2007 Job Start Date:   10/22/2007
Last Change:   01/03/2008 Job End Date:   12/31/2008
Appointment Status:   
Last Inspection By:   THEODORE JUNSCH       On     11/08/2007      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  

License #: 010799 Licensee Name: JOSEPH MARCHESE
Firm: 002033 Firm Name: CROSSLAND ELECT'L SYS INC
Firm Phone: 718-629-0260  Firm Address: 846 EAST 52ND STREET BROOKLYN NY 11203 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
6 - GENERAL WIRING
Total Fee:  $44.00
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   Z - Other
Store / Other:   CHURCH
Special Cert Approval:   E - EMERGENCY LIGHTING LOCAL LAW 16/84
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: ST. GEORGE CHURCH
Authorized Representative:  VIC FIABANE
Relationship To Owner:   CONSTRUCTION MANAGER


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   No
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 13        13                
Total Units : 26 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: Objection Flag:
Power Requested: Notice:  
Power Issued: Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  WORK AS PER ENGINEERS EMERGENCY LIGHTING PLAN # 402202157 TOTAL EMERGENCY LIGHT FIXTURES SHOWN IS AS FOLLOWS: SIX (6)- 2 HEAD EMERGENCY ONLY, SIX(6)- 3 HEAD COMBO EXIT/EMERGENCY & ONE (1) - 2 HEAD COMBO EXIT/EMERGENCY

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A262546
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 11/08/2007 11/14/2007 TJ1 C (30) (0) Y
INSPECTION COMMENTS: CERTIFICATE