BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A258371
Premises: 139-11 34 AVENUE QUEENS BIN: 4538625     Block: 4955   Lot: 1
   
Application Completed and Certified

Filed: 139-11 34 AV Census Tract:   889.01 Health Area:  1200
BASEMENT,1ST,2ND,3RD,4TH FLOOR Admin Area:   A - QUEENS Inspection Area:   B
QUEENS, NY 11354 Community Board:   407
Related Job Number:    402487180
DOB Cross Street(s):   LEAVITT STREET,    UNION STREET
Status:   C - JOB IS SIGNED OFF 06/08/2009
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  06/15/2007 5:04 PM
Application Entered:   06/15/2007 Job Start Date:   06/18/2007
Last Change:   06/08/2009 Job End Date:   06/18/2008
Appointment Status:   
Last Inspection By:   BOTSCH, E       On     06/03/2009      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 011704 Licensee Name: MICHAEL CIPRIANI
Firm: 002282 Firm Name: CIPRIANI ELECTRIC INC.
Firm Phone: 718-767-2928  Firm Address: 150-29 14TH AVENUE WHITESTONE NY 11357 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
8 - BOILER/BURNER WIRING
Total Fee:  $291.75
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup: IRA SEEMAN
Owner Business Name: IRASTAN-STONECREEK L.L.C.
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  0  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  1  
D. Over 250 MCM  0  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  7  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  0  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 68  105  11  43  68              
Total Units : 297 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 8 #4-Wire 0 #10-Wire 0
Existing Meters 0 + New Meters 8 - Removed Meters 0 = Total Meters 8

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 06/15/2007 Notice:  
Power Issued: 06/15/2007 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  TO INSTALL 200 AMP 3 PHASE 208 VOLT ELECTRIC SERVICE. TO WIRE COMPLETE BUILDING WITH 7- APARTMENTS. CERTIFICATE OF OCCUPANCY REQUSTED.

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A258371
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/03/2009 06/08/2009 EBT C E (30) (0) Y
INSPECTION COMMENTS: CERTIFICATE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Electrical Applications  |  Electrical Inspection Work Order  |  Back