| NYC Department of Buildings | ||
| Electrical Application Details for App #: A244162 | ||
| Premises: 48-21 5 STREET QUEENS | BIN: 4533602 Block: 31 Lot: 21 |
| Application Completed and Certified | ||
| Filed: | 5-15 49 AV | Census Tract: 7 | Health Area: 0720 | |
| ELEVATOR #2 | Admin Area: A - QUEENS | Inspection Area: C | ||
| QUEENS, NY 11101 | Community Board: 402 | |||
| Related Job Number: 402087148 | |||
| DOB Cross Street(s): 5 STREET, VERNON BOULEVARD | |||
| Status: C - JOB IS SIGNED OFF 12/11/2006 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 03/16/2006 4:12 PM | |
| Application Entered: 03/16/2006 | Job Start Date: 03/31/2006 | ||
| Last Change: 12/11/2006 | Job End Date: 08/01/2006 | ||
| Appointment Status: | |||
| Last Inspection By: REDDINGTON, J. On 12/07/2006 | |||
| Field Disp: C - INSPECTION PASSED | |||
| Energize Recommendation: | |||
| Objection Disposition: | |||
| License #: | 010191 | Licensee Name: | RONALD J SPIELER | |
| Firm: | 001367 | Firm Name: | SPIELER & RICCA ELEC'L CO | |
| Firm Phone: | 718-392-4100 | Firm Address: | 52-09 VAN DAM STREET L.I.C. NY 11101 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: N - NEW BUILDING | Work To Be Done:
3 - ELEVATOR/ESCALATOR/MATERIAL LIFT 9 - OTHER |
Total Fee: $165.00 | ||||||
| Other Work: ELEVATOR 4P11120 | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: YES | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: | ||||||||
| Building Used As: O - Office Bldg | |||||||
| Special Cert Approval: | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | BRIAN PINNEO | ||||||
| Owner Business Name: | 5-15 49TH HOLDING LLC | ||||||
| Authorized Representative: LYDIA GUERRIERO | |||||||
| Relationship To Owner: THYSSENELEVATOR,SUPPLIER | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| Buildings Total | ||||||||||||
| Total Units : 0 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | Objection Flag: | ||
| Power Requested: | Notice: | ||
| Power Issued: | Response: |
| Follow-Up: | K - (CLOSED) | ||
| Contractor's Comments: OUR#06001A2. POWER TO CONTROLLER AND PIT LIGHTING BY OTHERS. | |||
|
|