BIS Menu  |  DOB Violations  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: A226424
Premises: 30-85 VERNON BOULEVARD QUEENS BIN: 4533709     Block: 504   Lot: 12
   
Application Completed and Certified

Filed: 30-85 VERNON BLVD Census Tract:   81 Health Area:  0300
NONE Admin Area:   A - QUEENS Inspection Area:   A
QUEENS, NY 11102 Community Board:   401
Related Job Number:    401236051
DOB Cross Street(s):    30 DRIVE,    31 AVENUE
Status:   C - JOB IS SIGNED OFF 03/28/2006
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   10/29/2004 Job Start Date:   10/20/2004
Last Change:   03/28/2006 Job End Date:   10/20/2005
Appointment Status:   
Last Inspection By:   THEODORE JUNSCH       On     03/16/2006      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  E - ISSUE POWER AUTH
Objection Disposition:  

License #: 009904 Licensee Name: WILLIAM IZZO
Firm: 000701 Firm Name: IZZO ELECTRIC INC.
Firm Phone: 718-904-0164  Firm Address: 2522 EAST TREMONT AVENUE BRONX NY 10461 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
8 - BOILER/BURNER WIRING
Total Fee:  $3,837.25
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:  
Building Used As:   L - Five Or More Family
Special Cert Approval:   B - BOILER CONTROLS J-51 CERTIFICATION
Advisory Board Approval:  
Owner / Occup: ELENA KARACOSTA
Owner Business Name: EMPIRE HILDINGS GROUP II
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  1  
C. 201 Up to 600 AMPS  4  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  73  
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  2  
D. Over 250 MCM  4  
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  73  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  2  
D. 3 Phase Over 225 AMPS  0  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  1  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
Buildings Total 385  1314  184  325  385     38           
Total Units : 2631 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 73 #4-Wire 1 #10-Wire 1
Existing Meters 0 + New Meters 0 - Removed Meters 0 = Total Meters 0

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 10/29/2004 Notice:  
Power Issued: 10/29/2004 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

INSPECTION FOR APPLICATION #: A226424
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 03/16/2006 03/22/2006 TJ1 C E (85) (0) Y
INSPECTION COMMENTS: NONE




If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  DOB Violations  |  Electrical Inspection Work Order  |  Back