|
OATH/ECB Number |
Certification Status |
Respondent |
OATH/ECB Hearing Status |
Violation Date |
Infraction Codes |
OATH/ECB Penalty Due |
35243667M |
OPEN - NO COMPLIANCE RECORDED |
HP MORNINGSIDE HEIGHTS PO
| PENDING |
05/21/2024 |
203 |
$1,250.00 |
|
Severity: CLASS - 2 |
Inspect Unit: HPD
|
Viol Type: CONSTRUCTION |
|
35158870L |
RESOLVED - CERTIFICATE ACCEPTED |
BEACON 109 207-209 LLC
| IN VIOLATION |
02/19/2016 |
2D4 |
$0.00 |
|
Severity: CLASS - 2 |
Inspect Unit: ELECTRICAL DIVISION
|
Viol Type: ELECTRICAL |
|
35158869Y |
RESOLVED - CERTIFICATE ACCEPTED |
BEACON 109 207-209 LLC
| IN VIOLATION |
02/19/2016 |
1C9 |
$0.00 |
|
Severity: CLASS - 1 |
Inspect Unit: ELECTRICAL DIVISION
|
Viol Type: ELECTRICAL |
|
34883760X |
RESOLVED - N/A - DISMISSED |
BEACON 109207209 LLC
| DISMISSED |
10/16/2010 |
187 |
$0.00 |
|
Severity: CLASS - 1 |
Inspect Unit: SPECIAL OPERATIONS
|
|
|
34804755N |
RESOLVED - CERTIFICATE ACCEPTED |
BEACON 109207209 LLC
| IN VIOLATION |
08/21/2010 |
187 |
$0.00 |
|
Severity: CLASS - 1 |
Inspect Unit: SPECIAL OPERATIONS
|
|
|
34843628M |
RESOLVED - CERTIFICATE ACCEPTED |
BEACON 109 207-209 LLC
| IN VIOLATION |
03/02/2010 |
105, 172, 298 |
$0.00 |
|
Severity: CLASS - 1 |
Inspect Unit: MANHATTAN CONSTRUCTION
|
Viol Type: CONSTRUCTION |
|
34843629Y |
RESOLVED - CERTIFICATE ACCEPTED |
BEACON 109 207-209 LLC
| IN VIOLATION |
03/02/2010 |
101 |
$0.00 |
|
Severity: CLASS - 1 |
Inspect Unit: MANHATTAN CONSTRUCTION
|
Viol Type: CONSTRUCTION |
|
38167631H |
RESOLVED - N/A - DISMISSED |
FRANT HOTEL
| DISMISSED |
06/20/2007 |
BP7 |
$0.00 |
|
Severity: NON-HAZARDOUS |
Inspect Unit: ELEVATOR DIVISION
|
Viol Type: ELEVATOR |
|
38046563Y |
RESOLVED - CURE ACCEPTED |
FREIDMAN, AMI
| CURED/IN-VIO |
03/17/1995 |
B8G |
$0.00 |
|
Severity: NON-HAZARDOUS |
|
Viol Type: ELEVATOR |
|