|
| OATH/ECB Number |
Certification Status |
Respondent |
OATH/ECB Hearing Status |
Violation Date |
Infraction Codes |
OATH/ECB Penalty Due |
| 35139507N |
RESOLVED - CERTIFICATE ACCEPTED |
PALM CONSTRUCTION INC
GC609187 |
STIPULATION/IN-VIO |
09/02/2015 |
206 |
$0.00 |
|
Severity: CLASS - 2 |
Inspect Unit: EXCAVATION UNIT
|
Viol Type: CONSTRUCTION |
|
| 35118504P |
RESOLVED - CURE ACCEPTED |
PALM CONSTRUCTION INC.
GC609187 |
CURED/IN-VIO |
04/27/2015 |
210 |
$0.00 |
|
Severity: CLASS - 2 |
Inspect Unit: EXCAVATION UNIT
|
Viol Type: CONSTRUCTION |
|
| 35118503N |
RESOLVED - CURE ACCEPTED |
PALM CONSTRUCTION INC.
GC609187 |
CURED/IN-VIO |
04/27/2015 |
206 |
$0.00 |
|
Severity: CLASS - 2 |
Inspect Unit: EXCAVATION UNIT
|
|
|
| 35118502L |
RESOLVED - CURE ACCEPTED |
PALM CONSTRUCTION INC.
GC609187 |
CURED/IN-VIO |
04/27/2015 |
210 |
$0.00 |
|
Severity: CLASS - 2 |
Inspect Unit: EXCAVATION UNIT
|
Viol Type: CONSTRUCTION |
|
| 35118501J |
RESOLVED - CERTIFICATE ACCEPTED |
PALM CONSTRUCTION INC.
GC609187 |
ADMIT/IN-VIO |
04/27/2015 |
111 |
$0.00 |
|
Severity: CLASS - 1 |
Inspect Unit: EXCAVATION UNIT
|
Viol Type: CONSTRUCTION |
|
| 35118500H |
RESOLVED - CURE ACCEPTED |
PALM CONSTRUCTION INC.
GC609187 |
CURED/IN-VIO |
04/27/2015 |
206 |
$0.00 |
|
Severity: CLASS - 2 |
Inspect Unit: EXCAVATION UNIT
|
|
|
| 34910676Y |
RESOLVED - CERTIFICATE ACCEPTED |
THE LEONARD RUBIN REVOCAB
| IN VIOLATION |
04/15/2011 |
104 |
$0.00 |
|
Severity: CLASS - 1 |
Inspect Unit: EXCAVATION UNIT
|
Viol Type: CONSTRUCTION |
|