Electrical Application Details for App #: B425088
NO AHV RECORDS WERE FOUND FOR THIS BIN
Premises: 53 BOND STREET BROOKLYN BIN: 3426306     Block: 172   Lot: 5
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 61 BOND ST Census Tract:   41
ENTIRE BUILDING Admin Area:   B - BROOKLYN Inspection Area:   C
BROOKLYN, NY 11217 Community Board:   302
Related Job Number:    320914221
DOB Cross Street(s):   SCHERMERHORN STREET,    STATE STREET
Status:   C - JOB IS SIGNED OFF 01/14/2022
Request Type:   A - APPLICATION eFiled:   NO
Application Entered:   03/08/2017 Job Start Date:   02/14/2017
Last Change:   01/14/2022 Job End Date:   02/14/2020
Appointment Status:   
Last Inspection By:   DAMISO COOTE       On     01/14/2022      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 012022 Licensee Name: JOSEPH SORTINO
Firm: 003742 Firm Name: TOP SHELF ELECTRIC CORP
Firm Phone: 718-815-1700  Firm Address: 3917 AMBOY ROAD STATEN ISLAND NY 10308 

Work Started or Filed by Others: NO
Work Category:   N - NEW BUILDING Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $5,040.00
Hurricane Sandy Damage:   No
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   YES
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   H - Hotel
Special Cert Approval:  
Advisory Board Approval:   REQUIRED
Advisory Board Categories:      K - 1000 KVA SERVICE                            
Advisory Board Approval #:   54313     Submittal #: 16A0616  
Owner / Occup: ERIC BASS
Owner Business Name: BOND STREET OWNERS, LLC
Authorized Representative:   
Relationship To Owner:   


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  1  400A
D. 601 Up to 1200 AMPS  2  2-800A
E. Over 1200 AMPS  2  1-4000A, 1-2500A
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  3  2-#3, 1-#4
B. Over #2 to 1/0  0  
C. Over 1/0 to 250 MCM  13  4-4/0, 9-3/0
D. Over 250 MCM  37  28-500,4-350,3-300,2-250
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  31  
D. 3 Phase Over 225 AMPS  4  
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
CEL    40  62    32  106  16  235     
001    70  116    28  284     
MZ1             
002    60  75    38  208  30     
003    73  144    21  79  10  106     
004    79  150    48  51         
005    85  180    55  68  31  31         
006    85  180    55  68  31  31     
007    85  180    55  68  31  31         
008    85  180    55  68  31  31         
009    85  180    55  68  31  31         
010    85  180    55  68  31  31         
011    85  180    55  68  31  31         
012    85  180    55  68  31  31         
013    85  180    55  68  31  31     
ROF    15    29  10  465         
Buildings Total 1106  2176    666  1375     1104     46      
Total Units : 6473 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 3 #10-Wire 1
Existing Meters 0 + New Meters 4 - Removed Meters 0 = Total Meters 4

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 03/08/2017 Notice: 1 - FIRST NOTICE 12/10/2021
Power Issued: 03/08/2017 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

*NO AHV RECORDS WERE FOUND FOR THIS BIN
INSPECTION FOR APPLICATION #: B425088
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 06/14/2021 06/15/2021 SGY V (360) (40)
INSPECTION COMMENTS: INSPECTION NOT COMPLETE INSPECTED ONLY ADVISORY BOARD OBJECTIONS ISSUED REST OF HOTEL NOT READY FOR INSPECTION
 
(2) 07/12/2021 07/12/2021 SGY V X (180) (5)
INSPECTION COMMENTS: INSPECTION NOT COMPLETE INSPECTION COMPLETE ONLY FROM 4 TO 8 FLOOR OBJECTIONS ISSUED
 
(3) 12/10/2021 12/10/2021 SGY V Y (380) (19)
INSPECTION COMMENTS: INSPECTION COMPLETE OBJECTIONS ISSUED
 
(4) 01/14/2022 01/14/2022 DIT C R (180) (0)
INSPECTION COMMENTS: OBJECTIONS RESOLVED , OTHER FLOORS INSPECTED

OBJECTION FOR APPLICATION #: B425088
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(FLOOR: 003) ALL ADJ. BREAKERS 400A NOT AS PER DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
002 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(FLOOR: 003) ART 310.16 OCP FOR 3AWG MAX 100A SECTION 2
RSLV 06/14/2021 06/14/2021 01/14/2022
 
003 ( 46) PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY
(ALL FLOORS)ART 110.22 408.4 ALL SERVICE NOT LABELED AND ALL PANELS WITHOUTDIRECTIONS
RSLV 06/14/2021 06/14/2021 01/14/2022
 
004 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(ALL FLOORS) ART 110.16 ARC FLASH ALL SERVICE AND PANELS
RSLV 06/14/2021 06/14/2021 01/14/2022
 
005 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(ALL FLOORS) ART 240.12 FUSE COORDINATION NOT PROVIDED
RSLV 06/14/2021 06/14/2021 01/14/2022
 
006 ( 1) SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER
(BASEMENT) ART 250.64E 800A SS GEC RACEWAY NOT BONDED
RSLV 06/14/2021 06/14/2021 01/14/2022
 
007 ( 1) SERVICE EQUIPMENT ENCLOSURES ARE NOT BONDED TOGETHER
(BASEMENT) ART 250.92 2 PIPES FOR RETAIL SS NOT BONDED IN SEB
RSLV 06/14/2021 06/14/2021 01/14/2022
 
008 (192) CONDUCTORS ARE OVER FUSED AS PER TABLE 310.16
(BASEMENT) ART 310.16 SECTION 1 OCP FOR 1/0AWG MAX 130A
RSLV 06/14/2021 06/14/2021 01/14/2022
 
009 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(BASEMENT)ART 250.122 SIZE EGC 2500A FUSE 7 SET MC CABLE MIN 350MCM EGC FOREACH SET
RSLV 06/14/2021 06/14/2021 01/14/2022
 
010 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(BASEMENT) ART 645.15 DATA RACK NOT BONDED
RSLV 06/14/2021 06/14/2021 01/14/2022
 
011 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(BASEMENT) ART 250.94 INTERCOM GROUND BAR NOT PROVIDED FOR COMM ROOM
RSLV 06/14/2021 06/14/2021 01/14/2022
 
012 (220) DOUBLE LUGGING IN SERVICE SWITCH
(BASEMENT) ART 110.14A EGC DOUBLE LUGGED IN ATS-C-LSP
RSLV 06/14/2021 06/14/2021 01/14/2022
 
013 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) 3 RETAIL 200A DISCONNECTS NOT ON DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
014 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) ATS-C-LSP 1 SET 250MCM NOT AS PER DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
015 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) FEEDER FP TO ROOF 1 SET 600MCM NOT AS PER DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
016 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) TYPE FP TRANSFER SWITCH CONTROL BOX NOT ON DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
017 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) SECTION 1 TYPE FUSE TR 200R NOT AS PER DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
018 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) SECTION 2 100A FUSE NOT INSTALLED
RSLV 06/14/2021 06/14/2021 01/14/2022
 
019 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) SECTION 2 2 100A SWITCHES NOT INSTALLED
RSLV 06/14/2021 06/14/2021 01/14/2022
 
020 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) 1200A AND 800A FUSE TYPE KRP-C NOT AS PER DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
021 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) 800A SS SIZE EGC 1/0AWG NOT AS PER DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
022 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) SS 5 4 SET 500MCM NOT AS PER DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
023 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(BASEMENT) ONLY 4 SETS 500MCM FROM STREET NOT AS PER DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
024 (277) BONDING JUMPER IS NOT PER ART 250.66
(BASEMENT) ART 250.66 SIZE GEC BONDING JUMPER SEB
RSLV 06/14/2021 06/14/2021 01/14/2022
 
025 (277) BONDING JUMPER IS NOT PER ART 250.66
(BASEMENT) ART 250.66 SIZE BONDING JUMPER SS 5
RSLV 06/14/2021 06/14/2021 01/14/2022
 
026 (277) BONDING JUMPER IS NOT PER ART 250.66
(BASEMENT) ART 250.66 SIZE GEC FOR FA SS MIN 4AWG
RSLV 06/14/2021 06/14/2021 01/14/2022
 
027 ( 42) BUSHINGS ARE MISSING OR LOOSE
(BASEMENT) ART 300.4G BUSHING ALL 3 RETAIL DISCONNECTS
RSLV 06/14/2021 06/14/2021 01/14/2022
 
028 ( 55) CONDUCTORS SMALLER THAN 1/0 AWG HAVE BEEN RUN IN PARALLEL
(BASEMENT)ART 310.4B 310.16 SECTION 1 USE 2 SET 6AWG FOR 200A FUSE
RSLV 06/14/2021 06/14/2021 01/14/2022
 
029 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(BASEMENT)ART 110.7 USE SHEETROCK SCREW FOR ALL COVERS IN SWITCH BOARD
RSLV 06/14/2021 06/14/2021 01/14/2022
 
030 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(BASEMENT) ART 230.70B SS NOT LABELED
RSLV 06/14/2021 06/14/2021 01/14/2022
 
031 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(BASEMENT) ART 700.8A SIGN FOR GENERATOR LOCATION AND TYPE
RSLV 06/14/2021 06/14/2021 01/14/2022
 
032 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(BASEMENT) ART 700.8B GEC FOR GENERATOR NOT IDENTIFIED
RSLV 06/14/2021 06/14/2021 01/14/2022
 
033 (340) RECEPTACLES NOT TAMPERPROOF
(OPEN SPACE) ART 406.8B ALL OUTSIDE GFCI NOT WR
RSLV 06/14/2021 06/14/2021 12/10/2021
 
034 (340) RECEPTACLES NOT TAMPERPROOF
(OPEN SPACE) ART 406.8B NO COVER FOR OUTLET BOND STREET
RSLV 06/14/2021 06/14/2021 12/10/2021
 
035 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(ROOF) ART 250.4B METAL PLATFORM NOT BONDED GENERATOR
RSLV 06/14/2021 06/14/2021 12/10/2021
 
036 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(ROOF) SECTION 1 SIZE EGC FOR 2 SET 800A MIN 1/0AWG
RSLV 06/14/2021 06/14/2021 01/14/2022
 
037 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(ROOF) FA SPLICE BOX UNDER GENERATOR NOT ON DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
038 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(ROOF) SECTION 1 FUSE 400A LPN-RK NOT AS PER DRAWING
RSLV 06/14/2021 06/14/2021 01/14/2022
 
039 (221) NOT INSTALLED PER ADVISORY BOARD DRAWING
(ROOF) SECTION 1 NO FUSES
RSLV 06/14/2021 06/14/2021 01/14/2022
 
040 ( 55) CONDUCTORS SMALLER THAN 1/0 AWG HAVE BEEN RUN IN PARALLEL
(ROOF)ART 310.4B DB-R-GEN FOR PARALLEL RUN USE 1 SET IN PIPE AND SECONDSET IN MC CABLE
RSLV 06/14/2021 06/14/2021 12/10/2021
 
041 (192) CONDUCTORS ARE OVER FUSED AS PER TABLE 310.16
(FLOOR: 004) ART 310.16 OCP 6AWG FEEDER FOR PANEL
RSLV 07/12/2021 07/12/2021 12/10/2021
 
042 ( 46) PANEL HAS NOT BEEN PROVIDED WITH A DIRECTORY
(FLOOR: 004) ART 110.22A BOTH PANEL NOT LABELED
RSLV 07/12/2021 07/12/2021 12/10/2021
 
043 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(FLOOR: 008) ART 110.7 WOODEN WALL SHEETROCK SCREW FOR OUTLETS
RSLV 07/12/2021 07/12/2021 12/10/2021
 
044 (128) NEUTRAL IS GROUNDED BEYOND LOAD SIDE OF SERVICE SWITCH
(ALL FLOORS)ART 250.24A ALL ROOMS UNITS WHITE CONDUCTOR USE AS GROUND IN PANELON NEUTRAL BAR
RSLV 07/12/2021 07/12/2021 12/10/2021
 
045 ( 53) GFCI HAS NOT BEEN PROVIDED
(ALL FLOORS) ART 422.52 GFCI FOR WATER FOUNTAIN 5 AND 7 FLOOR
RSLV 07/12/2021 07/12/2021 12/10/2021
 
046 (124) TAP CONDUCTORS ARE NOT WITHIN 10 FT OR WITHIN 25 FT AS PER CODE
(FLOOR: 001) ART 408.36 TAP WITHOUT OCP ALL LUTRON LIGHTING PANELS
RSLV 12/10/2021 12/10/2021 01/14/2022
 
047 (192) CONDUCTORS ARE OVER FUSED AS PER TABLE 310.16
(FLOOR: 001)ART 310.16 PP-KP-N-6-4 3 AWG FUSED 200A 4 SWITCHES
RSLV 12/10/2021 12/10/2021 01/14/2022
 
048 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(FLOOR: 001)ART 250.8A SCREW FOR GROUND BAR IN ALL KITCHEN SPLICE BOXES AFTERPANELS ABOVE CEILING
RSLV 12/10/2021 12/10/2021 01/14/2022
 
049 (258) ENTRANCE TO WORKING SPACE IS OF INSUFFICIENT SIZE
(FLOOR: 001) ART 110.26C LOCATION 1200A DP IN KITCHEN WITHOUT FENCE
RSLV 12/10/2021 12/10/2021 01/14/2022
 
050 ( 34) KNOCKOUTS ARE NOT CLOSED IN PANEL BOX
(FLOOR: 002) ART 110.12A OPEN KO IN PP-2-N-1
RSLV 12/10/2021 12/10/2021 01/14/2022
 
051 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(FLOOR: 002) ART 406.8E FLOOR 50A OUTLET IN CONFERENCE ROOM
RSLV 12/10/2021 12/10/2021 01/14/2022
 
052 ( 36) CONDUCTORS ARE NOT PROPERLY COLOR CODED
(FLOOR: 004)ART 250.119 GREEN CONDUCTOR USE AS HOT IN BOTH 60A PANELS
RSLV 12/10/2021 12/10/2021 01/14/2022
 
053 (192) CONDUCTORS ARE OVER FUSED AS PER TABLE 310.16
(FLOOR: 014)ART 310.16 PB-R-N-1 10AWG FUSED 40A AND 70A 3 AWG FUSED 150A
RSLV 12/10/2021 12/10/2021 01/14/2022
 
054 (200) LIGHT CONTROL NOT PROVIDED
(ALL FLOORS)ART 210.70C LIGHTING NOT PROVIDED FOR ELECTRICAL CLOSETS
RSLV 12/10/2021 12/10/2021 01/14/2022
 
055 ( 36) CONDUCTORS ARE NOT PROPERLY COLOR CODED
(ALL FLOORS)ART 200.7C WHITE CONDUCTOR USE AS HOT PP-C-EM WATER PUMP (WATERROOM) PB-R-N 1 AND ALL DISCONNECTS IN ROOF BOILER ROOM
RSLV 12/10/2021 12/10/2021 01/14/2022
 
056 ( 42) BUSHINGS ARE MISSING OR LOOSE
(ALL FLOORS)ART 300.4G BUSHINGS DB-C-EM DB-C-N2 400A DISCONNECT IN CELLARMECHANICAL ROOM 1200A DP IN KITCHEN
RSLV 12/10/2021 12/10/2021 01/14/2022
 
057 ( 53) GFCI HAS NOT BEEN PROVIDED
(ALL FLOORS)ART 210.8 GFCI PROTECTION IN CONFERENCE ROOM BAR AND COFFEE BAR INLOBBY
RSLV 12/10/2021 12/10/2021 01/14/2022
 
058 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(ALL FLOORS)ART 110.2 SCREW FOR ALL METAL RACEWAY AND SPLICE BOXES CAN BE DAMAGEWIRE
RSLV 12/10/2021 12/10/2021 01/14/2022
 
059 (136) GROUNDING ELECTRODE CONDUCTOR IS NOT CONTINUOUS
(BASEMENT) ART 250.50 SECOND WATER MAIN NOT BONDED TO COLLECTOR BAR
RSLV 12/10/2021 12/10/2021 01/14/2022
 
060 (223) PROTECTION OF BRANCH CIRCUITS NOT INSTALLED AS PER CODE
(BASEMENT) ART 240.4 OCP FOR WATER PUMP MAX 150A ADJUSTED 250A
RSLV 12/10/2021 12/10/2021 01/14/2022
 
061 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(BASEMENT) ART 210.21B DRYER 120V CONNECTED TO 220V RECEPTACLE
RSLV 12/10/2021 12/10/2021 01/14/2022
 
062 ( 61) INSTALLATION NOT IN COMPLIANCE WITH NYSECCC - SEE COMMENTS
(BASEMENT) ART 110.7 CONDUCTORS NOT SECURED IN PP-C-EM METAL RACEWAY
RSLV 12/10/2021 12/10/2021 01/14/2022
 
063 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(ROOF) ART 250.4B WATER TOWER METAL PLATFORM NOT BONDED
RSLV 12/10/2021 12/10/2021 01/14/2022
 
064 ( 22) FIXED EQUIPMENT IS NOT PROPERLY GROUNDED
(ROOF) ART 250.148 EGC NOT BONDED TO DISCONNECT WATER TOWER
RSLV 12/10/2021 12/10/2021 01/14/2022