BIS Menu  |  Comments  |  Electrical Inspection Work Order  |  Back   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Electrical Application Details for App #: Z160202
NO AHV RECORDS WERE FOUND FOR THIS BIN
Premises: 820 12 AVENUE MANHATTAN BIN: 1089709     Block: 1105   Lot: 7501
   

DOB NOW: Inspections

Application Completed and Certified

Filed: 625 W 57TH ST Census Tract:   135 Health Area:  4500
GROUND Admin Area:   Z - UPPER MANHATTAN Inspection Area:   G
NEW YORK, NY 10019 Community Board:   104
DOB Cross Street(s):    11 AVENUE,    12 AVENUE
Status:   C - JOB IS SIGNED OFF 11/28/2017
Request Type:   A - APPLICATION eFiled:   YES Permit Issued:  04/17/2017 10:41 AM
Application Entered:   04/17/2017 Job Start Date:   04/17/2017
Last Change:   11/28/2017 Job End Date:   04/17/2018
Appointment Status:   
Last Inspection By:   VINCENT CASTALDO       On     11/28/2017      
Field Disp:   C - INSPECTION PASSED
Energize Recommendation:  
Objection Disposition:  R - REMOVED

License #: 011200 Licensee Name: CHRIS RICHEY
Firm: 002605 Firm Name: C.M. RICHEY ELEC'L CONTR
Firm Phone: 718-499-7417  Firm Address: 1001 SIXTH AVENUE SUITE 1102 NEW YORK NY 10018 

Work Started or Filed by Others: NO
Work Category:   R - REHABILITATION Work To Be Done:  
1 - SERVICE WORK/NOTIFY UTILITY
6 - GENERAL WIRING
Total Fee:  $1,085.50
Other Work:   
Work Related to a New or Amended Certificate of Occupancy:   NO
This Job Regulated by the NYC Energy Conservation Code:   No
Building Used As:   J - Theatre
Special Cert Approval:  
Advisory Board Approval:   NOT APPLICABLE
Owner / Occup:
Owner Business Name: DURST DEVELOPMENT, LLC
Authorized Representative:  JOSEPH HOBOT
Relationship To Owner:   AUTHORIZED SIGN.


WORK DESCRIPTION
BUILDING OVERVIEW Are Feeders Being Installed? :   Yes
(If feeders are being installed, provide a wiring diagram and calculations at the time of inspection)
Building Overview Work Items QUANTITY DESCRIPTION
SERVICE SWITCHES  
A. Up to 100 AMPS  0  
B. 101 Up to 200 AMPS  0  
C. 201 Up to 600 AMPS  0  
D. 601 Up to 1200 AMPS  0  
E. Over 1200 AMPS  0  
SER. ENT. & FDR COND (EACH SET)  
A. Up to #2 CONDUCTOR  6  (4SETS) 4#3, (2SETS) 4#10
B. Over #2 to 1/0  3  (3SETS) 4#4/0
C. Over 1/0 to 250 MCM  0  
D. Over 250 MCM  2  (2SETS) 4#600
PANELS  
A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs  0  
B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs  0  
C. 3 Phase Up to 225 AMPS  7  (1) 100A (6) 200A
D. 3 Phase Over 225 AMPS  1  (1) 800A
ELEVATORS / ESCALATORS / MATERIAL LIFTS  
A. Total No. of Elevators / Escalators / Material Lifts  0  
B. Each Additional 10 Floors Or Less  0  
BOILER CONTROLS  0  

FLOOR DESCRIPTIONS
Floor Apt. Number Of Outlets No. Of
Fixtures
Motors / Generators Heaters Transformers
Fixt Receptacles Switch Num Total HP KW Num Total KW Num Total KVA
ATT A/C
GND    240  310    55  240  22  90  12  225 
Buildings Total 240  310    55  240     90     12     225 
Total Units : 1172 units   

Signs: Field Connect: 0 Field Inspect: 0 Tags:

SERVICE / METER EQUIPMENT
Meter Request to Utility #3-Wire 0 #4-Wire 0 #10-Wire 1
Existing Meters 0 + New Meters 1 - Removed Meters 0 = Total Meters 1

Power Auth Flag: I - ISSUED Objection Flag:
Power Requested: 04/17/2017 Notice: 1 - FIRST NOTICE 09/18/2017
Power Issued: 04/17/2017 Response:  

Follow-Up: K - (CLOSED)
Contractor's Comments:  

 
Inspection Details
 

*NO AHV RECORDS WERE FOUND FOR THIS BIN
INSPECTION FOR APPLICATION #: Z160202
INSP
ID
FIELD
DATE
DISP
DATE
INSP
ID
FLD
DISP
OBJ
DISP
ENRG
REC
TIME
INSP
REINSP
DATE
NEW
OBJ
APPT
FLAG
 
(1) 09/16/2017 09/18/2017 MQY V (98) (4)
INSPECTION COMMENTS: INSPECTED PANELS, TRANSFORMERS, HVAC, & AND AN EMTPY THEATRE #7. (DID NOT INSPECT BAR, RESTAURANT, OTHER THEATRE ROOM AND BEHIND CONCESSION STANDS. TRANSFORMERS 600KCMILL SECONDARY CONDUCTORS TAPPED WITH 2/0 WIRES FOR 200 AMP PANELS THROUGH-OUT
 
(2) 11/28/2017 11/28/2017 VTC C R (21) (0)
INSPECTION COMMENTS: PASS

OBJECTION FOR APPLICATION #: Z160202
OBJECTION ID OBJECTION CODE OBJECTION DESCRIPTION & COMMENTS STAT FIRST LATEST RESLVD
 
001 (999) OTHER
(BASEMENT) 2/0 OVERFUSED AT 200A IN MAIN ELECTRIC ROOM T-OUT(310.16)
RSLV 09/16/2017 09/16/2017 11/28/2017
 
002 (999) OTHER
(BASEMENT)600 KCMILL SECONDARY OF BOTH 112.5 KVA TRANSFORMER IS TAPPED FORMULTIPLE PANELS (240.21)
RSLV 09/16/2017 09/16/2017 11/28/2017
 
003 (999) OTHER
(BASEMENT)110V RECEPTACLES IN COMMERCIAL KITCHEN NEEDS TO BE GFCI PROTECTED(210.8)
RSLV 09/16/2017 09/16/2017 11/28/2017
 
004 (999) OTHER
(BASEMENT)MECHANICAL ROOM ALL 277/480 DISCONNECTS NEEDS TO BE BONDED DUE TOCONCENTRIC KOS (250.97)
RSLV 09/16/2017 09/16/2017 11/28/2017



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.


BIS Menu  |  Comments  |  Electrical Inspection Work Order  |  Back