| BUILDING OVERVIEW |
Are Feeders Being Installed? : Yes |
| (If feeders are being installed, provide a wiring diagram and calculations at the time of inspection) |
| Building Overview Work Items |
QUANTITY |
DESCRIPTION |
| SERVICE SWITCHES |
|
| A. Up to 100 AMPS |
0 |
|
| B. 101 Up to 200 AMPS |
2 |
|
| C. 201 Up to 600 AMPS |
0 |
|
| D. 601 Up to 1200 AMPS |
0 |
|
| E. Over 1200 AMPS |
0 |
|
| SER. ENT. & FDR COND (EACH SET) |
|
| A. Up to #2 CONDUCTOR |
0 |
|
| B. Over #2 to 1/0 |
0 |
|
| C. Over 1/0 to 250 MCM |
0 |
|
| D. Over 250 MCM |
1 |
|
| PANELS |
|
| A. 1 Phase Up to 20-1 or 10-2 Pole Brkrs |
1 |
|
| B. 1 Phase Over to 21-1 or 10-2 Pole Brkrs |
0 |
|
| C. 3 Phase Up to 225 AMPS |
2 |
|
| D. 3 Phase Over 225 AMPS |
0 |
|
| ELEVATORS / ESCALATORS / MATERIAL LIFTS |
|
| A. Total No. of Elevators / Escalators / Material Lifts |
0 |
|
| B. Each Additional 10 Floors Or Less |
0 |
|
| BOILER CONTROLS |
0 |
|
| OBJECTION ID |
OBJECTION CODE |
OBJECTION DESCRIPTION & COMMENTS |
STAT |
FIRST |
LATEST |
RESLVD |
| |
| 001 |
( 18) |
DEFECTIVE RECEPTACLES ARE IN USE (FLOOR: 004) RECEPTACLES NOT WORKING IN BATH ROOM. |
RSLV |
12/03/2017 |
12/03/2017 |
03/28/2018 |
| |
| 002 |
( 29) |
OUTLET BOXES ARE NOT COVERED (FLOOR: 004) OPEN BOXES IN BAR AREA. |
RSLV |
12/03/2017 |
12/03/2017 |
03/28/2018 |
| |
| 003 |
(999) |
OTHER (FLOOR: 004)BAR RECEPTACLE BOXES SET IN COMBUSTIBLE MATERIALS. 210.4 |
RSLV |
12/03/2017 |
12/03/2017 |
03/28/2018 |
| |
| 004 |
( 36) |
CONDUCTORS ARE NOT PROPERLY COLOR CODED (FLOOR: 005)PANELS AND DISCONNECT SWITCH IN ELEVATOR MACHINE ROOM HAVE WHITEWIRES ON GROUND BARS. |
RSLV |
12/03/2017 |
12/03/2017 |
04/06/2018 |
| |
| 005 |
(999) |
OTHER (FLOOR: 005) BALCONY RECEPTACLES NOT WR. 406.8 |
RSLV |
12/03/2017 |
12/03/2017 |
03/28/2018 |
| |
| 006 |
(999) |
OTHER (FLOOR: 005) CLOSET WITH EXTENSION CORD FOR CABLE BOX. 400.8 |
RSLV |
12/03/2017 |
12/03/2017 |
03/28/2018 |
| |
| 007 |
(999) |
OTHER (FLOOR: 005) BALCONY RECEPTACLE NOT GFCI PROTECTED. 210.8 |
RSLV |
12/03/2017 |
12/03/2017 |
04/06/2018 |
| |
| 008 |
(129) |
SERVICE SWITCH NEUTRAL NOT BONDED TO ENCLOSURE (BASEMENT) SERVICE SWITCH NOT PROPERLY GROUNDED AND BONDED. |
RSLV |
12/03/2017 |
12/03/2017 |
04/06/2018 |
| |
| 009 |
(273) |
GROUND CLAMP NOT ACCESSIBLE (BASEMENT) NO ACCESS TO GROUND ROD CONNECTION. |
RSLV |
12/03/2017 |
12/03/2017 |
03/28/2018 |
| |
| 010 |
(999) |
OTHER (BASEMENT) BX CONNECTOR USED ON FLEX CORD FOR DRIVER. 110.3 |
RSLV |
12/03/2017 |
12/03/2017 |
03/28/2018 |
| |
| 011 |
(999) |
OTHER (BASEMENT)GROUPING AND BREAKER TIES NEEDED IN BOILER ROOM PANEL. 210.4 |
RSLV |
12/03/2017 |
12/03/2017 |
03/28/2018 |
| |
| 012 |
(999) |
OTHER (FLOOR: 005) SERVICE ENTRANCE BONDING PER NEC 250.102 |
RSLV |
03/28/2018 |
03/28/2018 |
04/06/2018 |
| |
| 013 |
(999) |
OTHER (FLOOR: 005) BOILER RM PANEL IDENTIFY EGC PER NEC 250.119 |
RSLV |
03/28/2018 |
03/28/2018 |
04/06/2018 |
| |
| 014 |
(999) |
OTHER (BASEMENT)MAIN SERVICE DISCONNECT ENCLOSURE IS NOT RATED FOR SERVICE EQUIPMENTUSE. ART. 110.3 |
RSLV |
04/06/2018 |
04/06/2018 |
09/13/2018 |