 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/02/2026 |
340923460 |
01 |
A3 |
R PERMIT-ENTIRE |
05/05/2026 |
0083189 PE |
HUANG |
|
NOT APPLICABLE
|
|
SUBMIT BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH DOB NOW ALT1 APPLICATION
|
|
Work on Floor(s): OSP
|
| 03/20/2014 |
320989490 |
01 |
A3 |
P APPROVED |
03/20/2014 |
0013891 RA |
CHIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/02/2026 TO LEGALIZED EXISTING CURB CUT AND RESOLVE VIOLAT
|
|
Work on Floor(s): OSP
|
| 03/05/2014 |
320515000 |
02 |
A1 |
P APPROVED |
05/15/2014 |
0013891 RA |
CHIN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/02/2026 SUBSEQUENT MH WORK TYPE FOR ALT-I APPLICATION#: 3
|
|
Work on Floor(s): 001 thru 002
|
| 02/04/2013 |
320515000 |
01 |
A1 |
P APPROVED |
05/15/2014 |
0013891 RA |
CHIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/02/2026 NEW 1-STORY VERTICAL EXTENSION ON EXISTING (1)-ST
|
|
Work on Floor(s): 001 thru 002
|