| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/17/2020 |
340763962 |
01 |
A2 |
R PERMIT-ENTIRE |
10/22/2020 |
0091837 PE |
ADEMOKUN |
Y |
NOT APPLICABLE
|
|
PROPOSED A GREEN ROOF GARDEN, BY INSTALLING ROOF DECKING NO CHANGE IN USE
|
|
Work on Floor(s): ROO
|
| 12/08/2000 |
301107102 |
01 |
A2 |
R PERMIT-ENTIRE |
12/12/2000 |
0063960 PE |
SOMEFUN |
|
NOT APPLICABLE
|
|
INSTALLATION OF BOILER. THERE IS NO CHANGE IN USE,EGRESS
|
|
Work on Floor(s): CEL
|
| 10/15/1998 |
300800943 |
01 |
A2 |
R PERMIT-ENTIRE |
10/21/1998 |
0068029 PE |
CHON |
|
NOT APPLICABLE
|
|
TO PROVIDE DRY CLEANING MACHINE RM.(VAPO R BARRIER CONSTRUCTION) IN EXIS
|
|
Work on Floor(s): 1
|
| 04/11/1996 |
300513656 |
01 |
A2 |
X SIGNED OFF |
08/21/1996 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
INSTALL DRY CLEANING STORE IN EXISTING S TORE (UG 6) PER PLANS RELOCATE
|
|
Work on Floor(s): CEL,1, ROF
|